Copper wrap plating describes copper continuity from a plated hole onto the surrounding surface of a plated structure. It is related to the integrity of the hole-to-surface connection, but it is not a synonym for a copper cap or a final surface finish. Identify the relevant structure and measurement location before discussing thickness.

Show where the wrap is measured
A useful cross-section distinguishes the hole wall, surrounding land, original foil, later deposits and any filled cavity. The wrap region turns from the barrel toward the surface. Total outer-layer copper at a distant trace does not automatically establish the copper at this local transition.
When a structure is processed through multiple stages, identify which deposit belongs to which stage. A single total-copper number can hide whether the intended continuity was achieved at the required location.
Use the agreed standard and revision
IPC-6012 and related acceptance documents must be applied in the revision, class and scope agreed for the product. Public examples or older technical presentations can explain the concept but should not be copied as a universal current minimum. Product addenda and procurement requirements may change the applicable conditions.
The tool below only sums entered deposits and their independent lower deviations at one stated location. It does not determine whether those deposits satisfy an IPC wrap requirement. That interpretation belongs to the documented construction and applicable specification.
Example: surface copper is not the same measurement
Suppose a board has a stated outer copper target that includes foil and later plating. That value does not prove that the required copper extends continuously from a filled hole onto its land. The inspection must address the local cross-section and the copper identity, not merely a distant surface thickness measurement.
If two deposits both cover a selected location, their nominal thicknesses may be added for a planning budget. If one deposit stops before that location, including it in the sum would be incorrect. State the measurement location with the calculation so the arithmetic remains meaningful.

Why fine-line processing is involved
Additional copper on exposed surfaces can change the etching burden and the minimum geometry that the process can support. A wrap-related route change should therefore trigger review of fine-line width and spacing, particularly on layers with dense patterns. The track tolerance guide explains the geometry side of that discussion.
Do not assume that a required local connection improvement can be achieved by indiscriminately increasing all surface copper. The manufacturing route needs to balance the specified connection with patterning and final dimensions.
Copper deposit thickness budget
Copper deposit thickness budget
Use the current inputs and keep the assumptions
Start with the example to understand the units and output, then use Clear for my inputs before entering your project. Example mode stays visibly labeled even if you edit its numbers. The form begins without a result so an illustrative value cannot be mistaken for an approved requirement. Every field must have a valid value; zero is accepted only where it has a meaningful role in the particular model.
Read the input notes before calculating. They identify the physical boundary and what is excluded. Keep the same unit convention across the drawing and worksheet. Changing an input invalidates the previous result and disables its download until you calculate again. This prevents an old number from appearing to describe a revised geometry.
The result is a screening record. A negative margin or an out-of-range condition identifies a question to resolve; a positive margin is not a manufacturing approval. Use the record with the actual drawing, material and project requirement. The model does not load CAD files, inspect images or retrieve private factory data.
Download the current result if it helps the discussion. The text includes the entered inputs, result and limitations. It stays on your device until you choose to attach or share it. Contact is a separate step; this page does not automatically populate the enquiry form or upload a file. Avoid confidential identifiers if you only need an exploratory calculation.
| Input | What to establish before using it |
|---|---|
| Review reference | Use a nonconfidential reference that lets you connect this calculation to the correct drawing revision. |
| Deposit A at stated location · micrometers | Include only copper that covers the measurement location. Starting foil at a different location cannot be silently counted as local cap or wrap copper. |
| A lower deviation · micrometers | Enter an absolute downward allowance, not a percentage. It cannot exceed the nominal deposit in this simple nonnegative model. |
| Deposit B at same location · micrometers | A second deposit is optional: use zero if absent. Confirm its identity and location before adding it to the first deposit. |
| B lower deviation · micrometers | The model subtracts independent lower bounds conservatively. It does not combine statistical distributions or determine a standard-specific minimum. |
Coordinate fill, cap and wrap notes
A filled and capped via may need several distinct requirements: fill material and completeness, surface cap condition, wrap continuity and final finish. Keep them separate on the drawing while showing how they relate in the cross-section. The capped-via page concentrates on the finished land surface.
A polymer cover cannot substitute for metal continuity. Conversely, the presence of metal around an opening does not prove that the cavity is filled. Avoid accepting an ambiguous 'via treatment included' statement as a complete construction definition.
Inspection and quotation questions
Identify which structures need review, the governing specification, sample locations and the evidence expected. Ask the quotation to state any added process or inspection work. Preserve the proposed route and approved exceptions with the release drawing so later lots do not rely on informal recollection.
Can a web article supply one wrap thickness for every board? No. Is wrap plating the same as ENIG or another finish? No. Can a nominal stack of thicknesses approve the connection? No. Send an annotated cross-section and the applicable procurement requirement for a focused manufacturing response.
Measure the right copper in the right location
Copper descriptions should identify both location and origin. Starting foil, a seed layer, electrolytic surface copper, barrel copper, fill and cap can coexist in one structure. A thickness value is only interpretable when the measurement location and included layers are stated. Do not compare a total-surface reading with a deposit-only requirement without reconciling those definitions.
Distinguish averages from local requirements. A panel can have an acceptable average while a critical location differs. The relevant inspection plan should identify hole families, panel positions and section locations that represent the construction. The appropriate sampling and acceptance criteria come from the agreed specification and project scope; a calculator cannot select them from a layer count.
The process route connects hole integrity with surface patterning. Copper needed for one interconnect operation may also appear on exposed surfaces and change the later etching task. Review fine-line geometry when the route changes. Conversely, reducing surface copper to simplify etching must not silently compromise a required barrel, cap or wrap condition. A cross-section and process map make these dependencies visible.
For filled structures, assess the internal and external results separately. A smooth surface does not prove a complete internal fill. A filled cavity does not establish every surrounding trace dimension. Ask which observations demonstrate void-related conditions, surface shape, connection continuity and final dimensions. Keep each result linked to the structure and location it actually represents.
Supplier chemistry and equipment documentation can explain a mechanism or a process option. It does not establish that a particular factory uses that system or has qualified the same performance. Treat brochure examples as examples with conditions, and ask for relevant manufacturing evidence when a design depends on a demanding feature. Do not turn a third-party product specification into an unverified RAYPCB capability claim.
The quotation should identify the required construction, inspection and any separate qualification work. If alternatives are offered, compare their resulting copper geometry and acceptance scope before comparing price. Keep approved deviations with the release drawing. A well-defined plating review produces measurable copper requirements and an evidence plan, while leaving the qualified process controls with the responsible manufacturer.
Standards, source context and limits
Use the performance and acceptance documents named in the procurement agreement, including their revisions and any applicable addenda. A design guide explains choices; a product acceptance requirement defines what must be demonstrated. Neither a reference link nor a calculator result is a certification of the board or the supplier. Where a value is contractually important, check the controlled document and agree the measurement method with the responsible parties.
Examples on this page are deliberately labeled and are not advertised RAYPCB limits. Supplier documentation is linked for the specific material or process context it explains. Equipment photographs and cross-section examples show the subject; they are not current production, inspection or qualification records for your order.