RAYPCB · ENGINEERING GUIDE
Panasonic HIPER D R-1755D: ECU Thermal Expansion
Panasonic HIPER D R-1755D is a glass-epoxy multilayer material considered for demanding assembly and automotive board discussions. The useful engineering task is to relate its method-qualified thermal data to the actual construction and process history.
The legacy page address uses HEPER spelling; the material discussed here is HIPER D. Keep the stable address while using the correct product identity and the Panasonic material hub for broader selection.

Keep Tg, decomposition and service conditions separate
The manufacturer sheet identifies R-1755D laminate with R-1650D prepreg and reports a DSC Tg of 163°C. A decomposition measurement is a separate property. Neither number alone defines the safe continuous temperature of a finished electronic product.
When comparing materials, retain the measurement method and specimen conditions. A DMA value for one grade should not be ranked directly against a DSC value for another as though they were a single common specification.
Construction decisions at a glance
| Review focus | Established context | Design boundary |
|---|---|---|
| Exact pair | R-1755D / R-1650D | Correct HIPER identity. |
| Tg context | 163°C DSC | Not continuous-use temperature. |
| Application | Customer automotive requirements | Not supplier certification. |
Map the heat history of the board
Record press operations, soldering cycles, repair allowances and the expected operating temperature range. Board thickness and the fine-hole population influence which features deserve particular attention. A general automotive application label does not approve the actual ECU construction.
Include copper distribution, hole diameters and critical interconnects in the review. Ask what evidence will be produced for the features that control reliability, rather than assuming an easy coupon represents every hole or interface.
| Review item | What to establish |
|---|---|
| Identity | HIPER D R-1755D and R-1650D |
| Temperature | Measurement methods and actual process history |
| Features | Fine holes and critical interconnects |
| Boundary | No automotive or service-life qualification from Tg |
Use free expansion as an explanatory model
The tool uses a simplified two-slope thickness expansion model across an entered transition. Its hypothetical example produces 30 µm of free growth for a 1.6 mm dielectric heated from 25°C to 200°C using the stated coefficients.
This is not a plated-hole fatigue model. Copper constraint, gradual property changes and accumulated damage are excluded. Use it to understand why thermal interval and direction matter, then obtain the actual material and construction data needed for qualification.

Compare HIPER variants without merging them
The HIPER M R-1755M guide addresses a mid-Tg material and a different hole-geometry task. The names D and M should remain visible in the drawing and supplier response. They are not interchangeable quality labels.
The R-1766(GH) guide provides a useful reminder that a standard glass-epoxy material should not be described as a high-heat solution merely because a previous page title used that phrase. Evaluate the required process history explicitly.
Separate chemistry and automotive qualification
For a halogen-free automotive route, the R-1566S guide addresses a distinct material family and its recognition mapping. Chemical composition, raw-material properties and qualification of an assembled ECU are separate evidence streams.
Define the customer mission profile and acceptance requirements. A supplier's material application examples do not establish an automotive certification for RAYPCB or guarantee the final product's lifetime. Request only the records relevant to the agreed scope.
Piecewise free thickness expansion
Piecewise free thickness expansion
Use the current inputs and keep the assumptions
Start with the example only to inspect the units and the calculation boundary. Replace every assumption with a value tied to your own document or measurement. An empty numeric field is not zero. The review-reference field is a local label; avoid entering customer names, confidential part numbers or other private information into a public worksheet.
After calculating, read the notes alongside the numerical result. Changing any input invalidates the displayed result and disables its download until you calculate again. For a comparison, keep the units, geometry, material condition and measurement boundary consistent. A long decimal result does not imply equally precise input data. The downloadable record stays on your device and can be attached manually to an inquiry. It is not automatically transferred into the Contact form.
If an input is unknown, identify the person or document needed to resolve it. Do not fill a gap with a favorable generic value simply to obtain a result. You can request a material or fabrication review without using the tool. The arithmetic illustrates a relationship; it does not accept a construction, certify a material, establish current pricing or replace a supplier process specification.
| Input | What to establish before using it |
|---|---|
| Review reference | Nonconfidential revision label. |
| Initial dielectric thickness · mm | Unconstrained specimen approximation. |
| Start temperature · °C | Must be less than final temperature. |
| End temperature · °C | Heating illustration only; not an approved exposure. |
| Assumed transition temperature · °C | Simplified sharp transition; use a defined measurement method. |
| CTE below transition · ppm/°C | Direction-specific value over the relevant interval. |
| CTE above transition · ppm/°C | Direction-specific value, not copied from in-plane CTE. |
Optional cost comparison from your own allowances
Use a quotation or a clearly labeled internal assumption for each input. Keep the quantity, construction and inspection scope the same when comparing alternatives. This uncalibrated planning model adds entered values; it contains no current market rates and does not issue a RAYPCB quotation. You can contact the team without completing it.
Optional project allowance comparison
Send a thermal-construction inquiry
Provide the R-1755D/R-1650D callout, source revision, stackup, thickness, copper, hole geometry, assembly history and quantity. Identify the most demanding features and any proposed alternatives. Attach the evidence requirement with the drawing.
The optional allowance comparison should include any extra qualification or inspection cost consistently. It does not calculate a current market price from Tg. The intended outcome is a reviewed construction and an explicit list of assumptions, deviations and evidence still required before release.
Close the material and construction decision together
The finished board combines a dielectric, copper patterns, holes, surface coatings and a manufacturing history. Its behavior cannot be inferred from a family name alone. State the supplied grade, reinforcement, thickness, copper and processing conditions that matter to the intended application.
Keep handling and assembly requirements with the fabrication drawing. A thin panel, punched outline or unusual support condition can change the production route even when the electrical circuit is simple. Ask the fabricator to review the actual features and panel format rather than assuming a dimensional example represents a production capability.
For cost comparison, hold the drawing, quantity, test scope and acceptance requirements constant. Record one-time tooling separately from recurring work, and distinguish raw material utilization from accepted-board yield. Any calculator on this page uses supplied assumptions; an actual quotation requires the files and an agreed scope.
A source-qualified table should be read alongside the exclusions and footnotes, not separated from them. If the supplier limits an application, identify whether that limitation affects the current design before requesting a price. A familiar family classification does not override an explicit restriction, and a positive calculator result cannot remove it.
For a repeat build, compare the newly proposed supply with the previously approved material record. Exact grade, manufacturing site where relevant, foil treatment, reinforcement and dimensional basis can matter. Define which changes require notification and which need technical approval. This avoids turning a purchasing substitution into an unnoticed design change.
Receiving records should support the agreed identity and traceability requirement. A certificate for a raw material, a finished-board inspection report and an assembly test result cover different boundaries. Request the records that actually answer the project questions rather than collecting unrelated certificates.
When a source contains conflicting values, keep the discrepancy visible until a controlled revision or written supplier response resolves it. Do not create a new table by combining the most favorable entries from several sources. The released drawing, material list and quotation should all describe the same accepted construction.
Standards, source context and limits
Use the edition, amendment and material-document revision named in the purchase agreement. A standards title, marketing label or supplier product family does not establish that a particular lot meets a requirement. Public summaries are useful for scope; the controlled specification and applicable test method govern acceptance.
The examples on this page are illustrative engineering scenarios. They are not RAYPCB production records or guaranteed material values. Source links identify the organizations responsible for the referenced information. Confirm applicability to the exact grade, construction and test condition before carrying a number into a drawing or qualification report. Sources were reviewed on 3 October 2026. A public catalog search is not proof that an unlisted product never existed. Where the exact designation or current technical sheet could not be verified, this page provides a clarification workflow rather than an invented material specification. Current supply, construction availability and qualification remain separate questions.
For fabrication scope and the agreed construction requirements, see PCB manufacturing.