{"id":19812,"date":"2022-09-26T03:56:42","date_gmt":"2022-09-26T03:56:42","guid":{"rendered":"https:\/\/www.raypcb.com\/?p=19812"},"modified":"2026-10-03T04:54:54","modified_gmt":"2026-10-03T04:54:54","slug":"circuit-card-assembly-testing","status":"publish","type":"post","link":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/","title":{"rendered":"8 Most Popular PCB Testing Methods During Manufacturing and Assembly"},"content":{"rendered":"<article class=\"b36-page b36-timeline\" data-b36-page=\"circuit-card-assembly-testing\"><header class=\"b36-header\"><div><p class=\"b36-kicker\">RAYPCB \u00b7 ENGINEERING GUIDE<\/p><h1>Circuit Card Assembly Testing: Build a Layered Test Plan<\/h1><p>Circuit card assembly testing should connect product risks to specific inspection and test activities. A useful plan states what each activity covers, when it occurs, what evidence it produces and who decides the disposition of failures. It also identifies important risks that remain uncovered.<\/p><p>This page owns the overall board-level test plan. It does not replace the detailed instructions for <a href=\"https:\/\/www.raypcb.com\/pcb-automated-optical-inspection-aoi\/\">AOI<\/a>, <a href=\"https:\/\/www.raypcb.com\/pcb-x-ray-inspection\/\">X-ray<\/a>, <a href=\"https:\/\/www.raypcb.com\/ict-test\/\">ICT<\/a>, boundary scan or functional testing. The online brief helps organize responsibilities and open items before the production sequence is frozen.<\/p><div class=\"b36-quick\"><p><a href=\"#engineering-tool\">Open circuit-card test-plan brief<\/a> \u00b7 <a href=\"https:\/\/www.raypcb.com\/contact\/\">Ask an engineering question<\/a><\/p><\/div><\/div><figure class=\"b36-hero-photo\"><a href=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/b30-06\/archive-07-technician-at-an-electronics-test-bench.webp\" target=\"_blank\" rel=\"noopener\"><img src=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/b30-06\/archive-07-technician-at-an-electronics-test-bench.webp\" width=\"999\" height=\"647\" alt=\"Technician at an electronics test bench\" loading=\"eager\"><\/a><figcaption>Technician at an electronics test bench. RAYPCB site archive image; illustrative context, not a current inspection or ownership record.<\/figcaption><\/figure><\/header><nav aria-label=\"Page sections\"><a href=\"#s1\">Design and process<\/a><a href=\"#engineering-tool\">Engineering tool<\/a><a href=\"#review\">Review method<\/a><a href=\"#references\">Standards and sources<\/a><\/nav><section class=\"b36-chapter\" id=\"s1\"><h2>Begin with functions and failure consequences<\/h2><p>List the functions that matter to the product and the failures that would prevent them. Distinguish manufacturing defects from design validation questions and long-term reliability concerns. A production screen may detect an assembly defect without qualifying the design for its service environment.<\/p><p>Use a risk review to prioritize coverage, but do not convert a generic website score into product approval. The responsible design and quality teams should decide which failures require prevention, detection or additional verification.<\/p><figure><a href=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/b30-06\/circuit-card-assembly-testing-construction.svg\" target=\"_blank\" rel=\"noopener\"><img src=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/b30-06\/circuit-card-assembly-testing-construction.svg\" width=\"1100\" height=\"650\" alt=\"A test plan maps requirements to complementary evidence\" loading=\"lazy\"><\/a><figcaption>A test plan maps requirements to complementary evidence. Original explanatory drawing; <a href=\"https:\/\/www.raypcb.com\/8-ways-to-restore-pcb-schematic-diagram-according-to-pcb-board\/\">schematic<\/a> geometry, not released manufacturing data or inspection evidence.<\/figcaption><\/figure><\/section><section class=\"b36-chapter\" id=\"s2\"><h2>Put each method at the useful stage<\/h2><p>SPI evaluates paste deposits before placement. AOI examines visible assembly features at the selected stage. X-ray addresses selected hidden geometry. Electrical methods evaluate the circuits and behaviors supported by their access and programs.<\/p><p>The sequence matters because an early observation can prevent further processing of an unsuitable board. Use the <a href=\"https:\/\/www.raypcb.com\/resources\/pcb-test-methods\/\">test-methods resource<\/a> to compare methods, then document the particular role of each in the product route.<\/p><div class=\"b36-scroll\" role=\"region\" tabindex=\"0\" aria-label=\"Task review checklist\"><table class=\"b36-table\"><thead><tr><th scope=\"col\">Review item<\/th><th scope=\"col\">What to establish<\/th><\/tr><\/thead><tbody><tr><th scope=\"row\">Risk<\/th><td>Name functions and consequences before selecting methods.<\/td><\/tr><tr><th scope=\"row\">Coverage<\/th><td>Map requirements to evidence without averaging unrelated metrics.<\/td><\/tr><tr><th scope=\"row\">Release<\/th><td>Define sampling, holds and failure disposition.<\/td><\/tr><tr><th scope=\"row\">Traceability<\/th><td>Preserve unit, program, firmware and rework history.<\/td><\/tr><\/tbody><\/table><\/div><\/section><section class=\"b36-chapter\" id=\"s3\"><h2>Define coverage without adding incompatible percentages<\/h2><p>AOI component coverage, accessible-net fraction and functional requirement coverage have different denominators. Adding them or averaging them does not produce a meaningful total coverage figure. Keep a matrix of requirements and corresponding evidence instead.<\/p><p>For every critical requirement, identify the method, condition, limit and record. If it lacks a verified test, mark it open and assign an owner. <a href=\"https:\/\/www.raypcb.com\/boundary-scan-testing\/\">Boundary scan<\/a> can help with selected structural access, but its capabilities still need a product-specific analysis.<\/p><figure><a href=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/b30-06\/archive-64-populated-circuit-assembly.webp\" target=\"_blank\" rel=\"noopener\"><img src=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/b30-06\/archive-64-populated-circuit-assembly.webp\" width=\"743\" height=\"800\" alt=\"Populated circuit assembly\" loading=\"lazy\"><\/a><figcaption>Populated circuit assembly. RAYPCB site archive image; illustrative context, not a current inspection or ownership record.<\/figcaption><\/figure><\/section><section class=\"b36-chapter\" id=\"s4\"><h2>Specify sampling and release decisions<\/h2><p>State which activities apply to every unit, a defined sample, the first article or a qualification group. A first-article review and a production sampling plan answer different questions. Neither should be described as full inspection without explaining the scope.<\/p><p>Define what happens when a sample fails, a station is unavailable or data are incomplete. A clear hold and escalation route prevents production pressure from turning missing evidence into assumed acceptance.<\/p><figure><a href=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/b30-06\/circuit-card-assembly-testing-measurement-boundary.svg\" target=\"_blank\" rel=\"noopener\"><img src=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/b30-06\/circuit-card-assembly-testing-measurement-boundary.svg\" width=\"1100\" height=\"650\" alt=\"Input definitions: Circuit-card test-plan brief\" loading=\"lazy\"><\/a><figcaption>Input definitions: Circuit-card test-plan brief. Original explanatory drawing; schematic geometry, not released manufacturing data or inspection evidence.<\/figcaption><\/figure><\/section><section class=\"b36-chapter\" id=\"engineering-tool\"><h2>Circuit-card test-plan brief<\/h2><div class=\"b36-instrument\"><p>Interactive engineering tool available on the website.<\/p><\/div><div class=\"b36-guide\"><h3>Use the current inputs and keep the assumptions<\/h3><p>Choose the engineering question before entering numbers. Fields begin blank. Load example fills teaching values so you can understand the model; those values are not recommended dimensions, process settings or market prices. The example label remains visible after edits. Reset before preparing a record based entirely on your own project data.<\/p><p>Use the displayed units and keep a reference for each input. Counts must describe the same scope, and measurements must share the declared conditions. A threshold entered by you remains your supplied review condition. The website does not turn it into an IPC limit or an approved product requirement. If the necessary value is unknown, obtain the evidence rather than replacing it with an attractive assumption.<\/p><p>Read the result and its limitations together. An access fraction is not fault coverage, a cost allowance is not a quotation, and a completed evidence checklist is not a safety or quality approval. Negative margins remain visible where the model permits them. They identify a conflict in the entered scenario rather than silently adjusting the result.<\/p><p>Changing an input invalidates the result and disables its download until you run the tool again. The text record contains the inputs, result and limitations. Processing stays in your browser; no CAD files, instruments or certificates are read. No data is automatically transferred to the enquiry form. Download and attach the record manually if useful, or contact RAYPCB directly without completing the tool.<\/p><\/div><div class=\"b36-scroll\" role=\"region\" tabindex=\"0\" aria-label=\"Calculator input definitions\"><table class=\"b36-table\"><thead><tr><th scope=\"col\">Input<\/th><th scope=\"col\">What to establish before using it<\/th><\/tr><\/thead><tbody><tr><th scope=\"row\">Review reference<\/th><td>Use a nonconfidential revision or scope reference.<\/td><\/tr><tr><th scope=\"row\">Critical functions \/ failure risks<\/th><td>Self-reported status; retain the actual evidence or N\/A rationale.<\/td><\/tr><tr><th scope=\"row\">Method-to-requirement mapping<\/th><td>Self-reported status; retain the actual evidence or N\/A rationale.<\/td><\/tr><tr><th scope=\"row\">Sampling and release rules<\/th><td>Self-reported status; retain the actual evidence or N\/A rationale.<\/td><\/tr><tr><th scope=\"row\">Unit and station traceability<\/th><td>Self-reported status; retain the actual evidence or N\/A rationale.<\/td><\/tr><tr><th scope=\"row\">Hold \/ retest \/ disposition ownership<\/th><td>Self-reported status; retain the actual evidence or N\/A rationale.<\/td><\/tr><tr><th scope=\"row\">Next action \/ record reference<\/th><td>Use a nonconfidential reference; this tool does not verify the record.<\/td><\/tr><\/tbody><\/table><\/div><\/section><section class=\"b36-chapter\" id=\"s5\"><h2>Preserve traceability across the route<\/h2><p>Associate the board identity with relevant material lots, process revision, firmware, station program and result. Rework should remain visible, with the required repeat tests identified. A final pass flag should not erase the earlier history.<\/p><p>The <a href=\"https:\/\/www.raypcb.com\/pcba-test-methods-and-details\/\">PCBA test specification<\/a> translates each planned check into executable detail. Keep these documents connected so that a change in the requirement triggers review of the station and the release plan.<\/p><\/section><section class=\"b36-chapter\" id=\"s6\"><h2>Example: a hidden gap between stations<\/h2><p>An illustrative controller passes optical inspection and powers on during a basic bench test. Neither activity exercises a rarely used communication channel. If that channel is a customer requirement, it needs an explicit verification path or a documented justified exclusion.<\/p><p>Adding another inspection label does not close the gap. The practical correction is to define the channel stimulus, expected response, conditions and record, then validate the test against appropriate hardware.<\/p><\/section><section class=\"b36-chapter\" id=\"s7\"><h2>Agree the plan with the manufacturing partner<\/h2><p>Send the current assembly data, critical functions, proposed methods, quantities, sample rules and required evidence. Identify customer-provided fixtures or programs and any unresolved engineering questions. Ask the supplier to confirm the actual scope and exclusions.<\/p><p>For production procurement, connect the plan to <a href=\"https:\/\/www.raypcb.com\/pcb-assembly\/\">PCB assembly<\/a> and <a href=\"https:\/\/www.raypcb.com\/quality-assurance\/\">quality information<\/a>. The online brief is optional; it helps prepare an enquiry but does not authorize production release.<\/p><\/section><section class=\"b36-chapter\" id=\"s8\"><h2>Questions to resolve before the next build<\/h2><p>Is more testing always better? Additional testing is useful when it addresses a relevant risk with an appropriate method and decision rule. Repeating overlapping checks without understanding their limits can add time while leaving a critical function uncovered. Review the requirement-to-evidence map and resolve actual gaps. Consider effects of the test itself when the method stresses or consumes the specimen.<\/p><p>Who owns the final plan? The project should identify the responsible product, quality and manufacturing owners. A supplier may propose practical methods, but product-specific functions and acceptance requirements need an authorized source. Keep ownership explicit for sampling, deviations and release so that an unresolved question does not move silently from one team to another while production proceeds.<\/p><\/section><section class=\"b36-chapter\" id=\"review\"><h2>Turn the plan into controlled evidence and responsibilities<\/h2><p>Begin with a requirement-to-record map. Each important decision should identify the object being evaluated, the method, the responsible owner and the evidence expected. This makes gaps visible before a supplier quotation or production program turns assumptions into routine practice. Keep mandatory requirements separate from useful supplementary observations.<\/p><p>Control document identity at the level needed for the task. A drawing, standard, firmware image, test program and fixture may each have its own revision. Record the compatible combination rather than assuming that the newest file in every category belongs together. Resolve conflicts between the purchase requirement and the implementation before work begins.<\/p><p>Ask whether another qualified reviewer can reproduce the interpretation. The record should identify units, locations, conditions, limits and any decision rule. A pass statement without scope can be misleading; a long report without specimen identity can be equally unhelpful. More data is valuable only when it answers the question and remains traceable.<\/p><p>Separate evidence availability from evidence verification. A box marked recorded means that someone reports having a document, not that the document is current, applicable or correct. Review the actual material and retain a reference to the approved version. The online worksheets intentionally avoid a compliance percentage because incomplete evidence does not become acceptable through averaging.<\/p><p>Define the handling of exceptions. Missing information, an invalid run, an unavailable station and a confirmed product failure need different actions. Record who can approve a deviation and which requirements remain binding. A supplier acknowledgment should not be mistaken for technical approval, and a successful software run should not substitute for method validation.<\/p><p>For external work, confirm scope and responsibility. Identify any subcontracted activity, the method used, the report issuer and the records that will be returned. Where accreditation is relevant, verify the applicable scope rather than relying on a broad logo. Where the work is outside that scope, describe it accurately instead of implying a status that has not been established.<\/p><p>Use the handoff to support the next person in the process. A buyer needs comparable scope, an engineer needs interpretable evidence and a production team needs executable instructions. A concise controlled package can serve all three when the task, version, result and open points are clear. Keep confidential design and customer information in the agreed project channel rather than in public comments or analytics.<\/p><figure><a href=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/b30-06\/circuit-card-assembly-testing-review-sequence.svg\" target=\"_blank\" rel=\"noopener\"><img src=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/b30-06\/circuit-card-assembly-testing-review-sequence.svg\" width=\"1100\" height=\"650\" alt=\"Review points: Circuit Card Assembly Testing\" loading=\"lazy\"><\/a><figcaption>Review points: Circuit Card Assembly Testing. Original explanatory drawing; schematic geometry, not released manufacturing data or inspection evidence.<\/figcaption><\/figure><\/section><section class=\"b36-standards\" id=\"references\"><h2>Standards, source context and limits<\/h2><p>Use each reference for its stated scope. Equipment and material documentation applies to the identified product and conditions. A published study describes its own specimens and methods; its settings are not universal production limits. Public standard summaries and revision tables do not replace the controlled normative document.<\/p><p>Agree the applicable standards, revisions, product class where relevant, measurement methods and exceptions before production. Distinguish printed-board requirements, assembly workmanship, laboratory competence and finished-product certification. A method name or photograph does not establish that a supplier holds an accreditation or that a particular test is included in an order.<\/p><p>Archive photographs illustrate relevant boards, equipment or operations from the existing RAYPCB website. They are not evidence of current equipment ownership or results from your project. Original diagrams explain concepts and measurement boundaries; they are not inspection records or released manufacturing drawings. Confirm the actual service and reporting scope in the project review.<\/p><figure><a href=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/b30-06\/circuit-card-assembly-testing-process-handoff.svg\" target=\"_blank\" rel=\"noopener\"><img src=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/b30-06\/circuit-card-assembly-testing-process-handoff.svg\" width=\"1100\" height=\"650\" alt=\"Controlled handoff: Circuit Card Assembly Testing\" loading=\"lazy\"><\/a><figcaption>Controlled handoff: Circuit Card Assembly Testing. Original explanatory drawing; schematic geometry, not released manufacturing data or inspection evidence.<\/figcaption><\/figure><ul><li><a href=\"https:\/\/www.keysight.com\/us\/en\/assets\/7018-05663\/technical-overviews\/5992-2186.pdf\" target=\"_blank\" rel=\"noopener\">Keysight: component tolerances and ICT measurement paths<\/a><\/li><li><a href=\"https:\/\/www.electronics.org\/ipc-document-revision-table\" target=\"_blank\" rel=\"noopener\">IPC official document revision information<\/a><\/li><\/ul><\/section><aside class=\"b36-cta\"><h2>Review the requirement with RAYPCB<\/h2><p>Send the current board or assembly revision, relevant drawing, test or protection requirement, quantity and the specific question you need answered. Identify fixed requirements and options that remain open. The worksheet can support the discussion, but completing it is optional. A manufacturing proposal and quotation need a review of the actual files and agreed acceptance scope.<\/p><a class=\"b36-button\" href=\"https:\/\/www.raypcb.com\/contact\/\">Request an engineering review<\/a><p class=\"b36-small\">For the surrounding topic, continue to <a href=\"https:\/\/www.raypcb.com\/resources\/pcb-test-methods\/\">PCB test methods<\/a>. For the board-assembly service route, see <a href=\"https:\/\/www.raypcb.com\/pcb-assembly\/\">PCB assembly<\/a>. Tool downloads stay on your device; attach them manually if useful. Content prepared 2 October 2026.<\/p><\/aside><\/article>","protected":false},"excerpt":{"rendered":"<p>RAYPCB \u00b7 ENGINEERING GUIDECircuit Card Assembly Testing: Build a Layered Test PlanCircuit card assembly testing should connect product risks to specific inspection and test activities. A useful plan states what each activity covers, when it occurs, what evidence it produces and who decides the disposition&hellip;<\/p>\n","protected":false},"author":1,"featured_media":16771,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[1],"tags":[],"class_list":["post-19812","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blogs"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>8 Most Popular PCB Testing Methods During Manufacturing and Assembly - RayPCB<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"8 Most Popular PCB Testing Methods During Manufacturing and Assembly - RayPCB\" \/>\n<meta property=\"og:description\" content=\"RAYPCB \u00b7 ENGINEERING GUIDECircuit Card Assembly Testing: Build a Layered Test PlanCircuit card assembly testing should connect product risks to specific inspection and test activities. A useful plan states what each activity covers, when it occurs, what evidence it produces and who decides the disposition&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/\" \/>\n<meta property=\"og:site_name\" content=\"RayPCB\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-26T03:56:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-03T04:54:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.raypcb.com\/wp-content\/uploads\/2022\/05\/Assembly-Testing.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"RAYPCB\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"RAYPCB\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/circuit-card-assembly-testing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/circuit-card-assembly-testing\\\/\"},\"author\":{\"name\":\"RAYPCB\",\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/#\\\/schema\\\/person\\\/a3e536e8f139d147d3607efe2152c88f\"},\"headline\":\"8 Most Popular PCB Testing Methods During Manufacturing and Assembly\",\"datePublished\":\"2022-09-26T03:56:42+00:00\",\"dateModified\":\"2026-10-03T04:54:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/circuit-card-assembly-testing\\\/\"},\"wordCount\":2446,\"image\":{\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/circuit-card-assembly-testing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.raypcb.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Assembly-Testing.jpg\",\"articleSection\":[\"Blogs\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/circuit-card-assembly-testing\\\/\",\"url\":\"https:\\\/\\\/www.raypcb.com\\\/circuit-card-assembly-testing\\\/\",\"name\":\"8 Most Popular PCB Testing Methods During Manufacturing and Assembly - RayPCB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/circuit-card-assembly-testing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/circuit-card-assembly-testing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.raypcb.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Assembly-Testing.jpg\",\"datePublished\":\"2022-09-26T03:56:42+00:00\",\"dateModified\":\"2026-10-03T04:54:54+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/#\\\/schema\\\/person\\\/a3e536e8f139d147d3607efe2152c88f\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/circuit-card-assembly-testing\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.raypcb.com\\\/circuit-card-assembly-testing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/circuit-card-assembly-testing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.raypcb.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Assembly-Testing.jpg\",\"contentUrl\":\"https:\\\/\\\/www.raypcb.com\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Assembly-Testing.jpg\",\"width\":1920,\"height\":800,\"caption\":\"Assembly Testing\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/circuit-card-assembly-testing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.raypcb.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"8 Most Popular PCB Testing Methods During Manufacturing and Assembly\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/#website\",\"url\":\"https:\\\/\\\/www.raypcb.com\\\/\",\"name\":\"RayPCB\",\"description\":\"PCB manufacturer and PCB assembly\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.raypcb.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/#\\\/schema\\\/person\\\/a3e536e8f139d147d3607efe2152c88f\",\"name\":\"RAYPCB\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ab28fde9e41b21b7378c7dfb18d6e7a339fd01473b7fddcfad0b3389cb5cd7a3?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ab28fde9e41b21b7378c7dfb18d6e7a339fd01473b7fddcfad0b3389cb5cd7a3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ab28fde9e41b21b7378c7dfb18d6e7a339fd01473b7fddcfad0b3389cb5cd7a3?s=96&d=mm&r=g\",\"caption\":\"RAYPCB\"},\"sameAs\":[\"https:\\\/\\\/www.raypcb.com\"],\"url\":\"https:\\\/\\\/www.raypcb.com\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"8 Most Popular PCB Testing Methods During Manufacturing and Assembly - RayPCB","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/","og_locale":"en_US","og_type":"article","og_title":"8 Most Popular PCB Testing Methods During Manufacturing and Assembly - RayPCB","og_description":"RAYPCB \u00b7 ENGINEERING GUIDECircuit Card Assembly Testing: Build a Layered Test PlanCircuit card assembly testing should connect product risks to specific inspection and test activities. A useful plan states what each activity covers, when it occurs, what evidence it produces and who decides the disposition&hellip;","og_url":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/","og_site_name":"RayPCB","article_published_time":"2022-09-26T03:56:42+00:00","article_modified_time":"2026-10-03T04:54:54+00:00","og_image":[{"width":1920,"height":800,"url":"https:\/\/www.raypcb.com\/wp-content\/uploads\/2022\/05\/Assembly-Testing.jpg","type":"image\/jpeg"}],"author":"RAYPCB","twitter_card":"summary_large_image","twitter_misc":{"Written by":"RAYPCB","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/#article","isPartOf":{"@id":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/"},"author":{"name":"RAYPCB","@id":"https:\/\/www.raypcb.com\/#\/schema\/person\/a3e536e8f139d147d3607efe2152c88f"},"headline":"8 Most Popular PCB Testing Methods During Manufacturing and Assembly","datePublished":"2022-09-26T03:56:42+00:00","dateModified":"2026-10-03T04:54:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/"},"wordCount":2446,"image":{"@id":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/#primaryimage"},"thumbnailUrl":"https:\/\/www.raypcb.com\/wp-content\/uploads\/2022\/05\/Assembly-Testing.jpg","articleSection":["Blogs"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/","url":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/","name":"8 Most Popular PCB Testing Methods During Manufacturing and Assembly - RayPCB","isPartOf":{"@id":"https:\/\/www.raypcb.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/#primaryimage"},"image":{"@id":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/#primaryimage"},"thumbnailUrl":"https:\/\/www.raypcb.com\/wp-content\/uploads\/2022\/05\/Assembly-Testing.jpg","datePublished":"2022-09-26T03:56:42+00:00","dateModified":"2026-10-03T04:54:54+00:00","author":{"@id":"https:\/\/www.raypcb.com\/#\/schema\/person\/a3e536e8f139d147d3607efe2152c88f"},"breadcrumb":{"@id":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/#primaryimage","url":"https:\/\/www.raypcb.com\/wp-content\/uploads\/2022\/05\/Assembly-Testing.jpg","contentUrl":"https:\/\/www.raypcb.com\/wp-content\/uploads\/2022\/05\/Assembly-Testing.jpg","width":1920,"height":800,"caption":"Assembly Testing"},{"@type":"BreadcrumbList","@id":"https:\/\/www.raypcb.com\/circuit-card-assembly-testing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.raypcb.com\/"},{"@type":"ListItem","position":2,"name":"8 Most Popular PCB Testing Methods During Manufacturing and Assembly"}]},{"@type":"WebSite","@id":"https:\/\/www.raypcb.com\/#website","url":"https:\/\/www.raypcb.com\/","name":"RayPCB","description":"PCB manufacturer and PCB assembly","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.raypcb.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.raypcb.com\/#\/schema\/person\/a3e536e8f139d147d3607efe2152c88f","name":"RAYPCB","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/ab28fde9e41b21b7378c7dfb18d6e7a339fd01473b7fddcfad0b3389cb5cd7a3?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/ab28fde9e41b21b7378c7dfb18d6e7a339fd01473b7fddcfad0b3389cb5cd7a3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ab28fde9e41b21b7378c7dfb18d6e7a339fd01473b7fddcfad0b3389cb5cd7a3?s=96&d=mm&r=g","caption":"RAYPCB"},"sameAs":["https:\/\/www.raypcb.com"],"url":"https:\/\/www.raypcb.com\/author\/admin\/"}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/www.raypcb.com\/wp-content\/uploads\/2022\/05\/Assembly-Testing.jpg","_links":{"self":[{"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/posts\/19812","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/comments?post=19812"}],"version-history":[{"count":1,"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/posts\/19812\/revisions"}],"predecessor-version":[{"id":120474,"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/posts\/19812\/revisions\/120474"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/media\/16771"}],"wp:attachment":[{"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/media?parent=19812"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/categories?post=19812"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/tags?post=19812"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}