{"id":8456,"date":"2021-03-25T02:27:25","date_gmt":"2021-03-25T02:27:25","guid":{"rendered":"https:\/\/www.raypcb.com\/?page_id=8456"},"modified":"2026-09-30T07:25:07","modified_gmt":"2026-09-30T07:25:07","slug":"pcba-quality-control","status":"publish","type":"page","link":"https:\/\/www.raypcb.com\/pcba-quality-control\/","title":{"rendered":"PCBA Quality Control"},"content":{"rendered":"<div class=\"quality-r1\"><div class=\"qpl-page\"><header class=\"qpl-hero\"><div class=\"qpl-wrap\"><p class=\"qpl-breadcrumb\"><a href=\"https:\/\/www.raypcb.com\/pcb-assembly\/\">PCB Assembly<\/a> \/ Quality planning<\/p><div class=\"qpl-hero-grid\"><div><p class=\"qpl-kicker\">RAYPCB \u00b7 Inspection and test planning<\/p><h1>PCBA quality control: from incoming kit to verified assembly<\/h1><p class=\"qpl-lead\">Connect the approved BOM and assembly revision to first-build checks, inspection, electrical tests and shipment records. Keep first-pass yield, rework and final acceptance visible as separate measures.<\/p><div class=\"qpl-actions\"><a class=\"qpl-btn\" href=\"https:\/\/www.raypcb.com\/contact\/\">Review your assembly control plan<\/a><a class=\"qpl-btn qpl-secondary\" href=\"#tool\">Use the planning tool<\/a><\/div><p class=\"qpl-note\">Share your current requirements and open questions. Tool use is optional.<\/p><\/div><figure><img src=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/quality-planning\/smt-aoi-equipment.webp\" width=\"600\" height=\"360\" loading=\"eager\" alt=\"SMT AOI inspection equipment\"><figcaption>SMT <a href=\"https:\/\/www.raypcb.com\/pcb-automated-optical-inspection-aoi\/\">AOI<\/a> inspection equipment. Published RAYPCB process photograph; the image does not establish the scope or result of your order.<\/figcaption><\/figure><\/div><\/div><\/header><nav class=\"qpl-nav\" aria-label=\"On this page\"><div class=\"qpl-wrap\"><a href=\"#answer\">Key answer<\/a><a href=\"#route\">Practical plan<\/a><a href=\"#tool\">Interactive tool<\/a><a href=\"#questions\">Questions<\/a><a href=\"#project-review\">Project review<\/a><\/div><\/nav><section class=\"qa-section\" id=\"quick-answer\"><div class=\"qa-wrap\"><div class=\"qa-prose\"><h2>What should an assembly quality plan actually control?<\/h2><p>Control the build identity first: PCB revision, fitted variant, approved components and firmware. Then define the checks at printing, placement, soldering and test. A board can look correct but contain the wrong firmware or fail under load, so final acceptance needs the specified product-level requirements too.<\/p><p><a href=\"#evidence-review\">Review the evidence fields and engineering example<\/a><\/p><\/div><\/div><\/section><section class=\"qpl-section\" id=\"answer\"><div class=\"qpl-wrap\"><div class=\"qpl-prose\"><h2>What is PCBA quality control?<\/h2><p><a href=\"https:\/\/www.raypcb.com\/what-is-the-difference-between-pcb-and-pcba\/\">PCBA<\/a> quality control is the coordinated checking and control of materials, assembly operations and product verification for a populated circuit board. It connects the released BOM and build instructions to the actual assembly, inspection results, test records and disposition. Its purpose is to make conformity demonstrable for the specified product, not simply to collect inspection photographs.<\/p><p>The <a href=\"https:\/\/www.raypcb.com\/pcb-assembly\/\">PCB Assembly service<\/a> defines the manufacturing scope. This page explains how to plan the quality controls around that scope: incoming parts, process setup, soldering, verification, nonconforming work and traceability. The wider <a href=\"https:\/\/www.raypcb.com\/quality-assurance\/\">quality assurance overview<\/a> remains the place for supplier-system and credential discussions.<\/p><p>Begin by agreeing what will be built and what evidence will support acceptance. A general instruction such as \u201ctest all boards\u201d is incomplete unless it defines the tests, limits, revision and record. Testing every unit is a statement about population; it does not automatically mean every potential defect or operating condition is covered.<\/p><figure><img src=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/quality-planning\/pcba-quality-control-route.svg\" width=\"1200\" height=\"620\" loading=\"lazy\" alt=\"Place each control where it can prevent or reveal the issue\"><figcaption>A conceptual route connects materials, setup, processing, verification and release. The project-specific route determines which methods and records are required.<\/figcaption><\/figure><\/div><\/div><\/section><section class=\"qpl-section\" id=\"route\"><div class=\"qpl-wrap\"><div class=\"qpl-prose\"><h2>Put the control at the point where it can act<\/h2><p>Quality controls are most useful when they detect or prevent the relevant problem before more work hides it. Incoming checks address identity and material condition. Paste and placement controls act before or around soldering. Optical, <a href=\"https:\/\/www.raypcb.com\/pcb-x-ray-inspection\/\">X-ray<\/a> and electrical methods answer different questions after selected process steps. The exact route depends on the assembly and the requirements.<\/p><div class=\"qpl-table\" tabindex=\"0\" role=\"region\" aria-label=\"Quality planning comparison\"><table><thead><tr><th scope=\"col\">Stage<\/th><th scope=\"col\">Main question<\/th><th scope=\"col\">Record or reaction to define<\/th><\/tr><\/thead><tbody><tr><th scope=\"row\">Incoming kit<\/th><td>Correct identity, quantity, condition and approval?<\/td><td>BOM\/kit reconciliation, hold and shortage resolution<\/td><\/tr><tr><th scope=\"row\">Line preparation<\/th><td>Correct programs, paste, stencil, feeders and variant?<\/td><td>Setup verification and first-piece disposition<\/td><\/tr><tr><th scope=\"row\">Printing and placement<\/th><td>Process within the approved setup?<\/td><td>Measurements, reviewed calls and adjustment history<\/td><\/tr><tr><th scope=\"row\">Soldering and manual work<\/th><td>Approved process and instructions followed?<\/td><td>Profile\/setup evidence and operator\/process records<\/td><\/tr><tr><th scope=\"row\">Inspection and test<\/th><td>Required characteristics verified under stated conditions?<\/td><td>Reviewed results, limits, test revision and exclusions<\/td><\/tr><tr><th scope=\"row\">Rework and release<\/th><td>Findings resolved and affected checks repeated?<\/td><td>Rework history, retest and authorized disposition<\/td><\/tr><\/tbody><\/table><\/div><p>Do not copy another product\u2019s route simply because both use SMT. Hidden joints, through-hole connectors, coating, programming and product-specific tests change the control plan. Define who approves changes to the route and how the first affected serial or lot is identified.<\/p><\/div><\/div><\/section><section class=\"qpl-section\" id=\"incoming\"><div class=\"qpl-wrap\"><div class=\"qpl-prose\"><h2>Control the BOM, variant and supplied materials<\/h2><p>The assembly release must identify the intended variant and exact approved purchasing identities. An item marked DNP must remain distinguishable from a missing fitted part. Customer-supplied components need the same clear identification and condition review as assembler-purchased material; ownership alone does not establish suitability.<\/p><p>Use the <a href=\"https:\/\/www.raypcb.com\/bom-of-pcb-assembly\/\">assembly BOM guide<\/a> to prepare manufacturer names, exact part numbers and fitted references. Confirm how alternate approvals are recorded. A supplier should not turn a shortage into an unapproved electrical or mechanical substitution, even when the suggested part has a similar headline rating.<\/p><p>Record relevant handling requirements and packaging history. The <a href=\"https:\/\/www.ti.com\/design-development\/packaging.html\" target=\"_blank\" rel=\"noopener\">TI packaging resources<\/a> provide examples of part-specific package, carrier and moisture-sensitivity information. Actual handling must follow the component and process requirements, rather than a universal baking instruction copied into every build.<\/p><\/div><\/div><\/section><section class=\"qpl-section\" id=\"setup\"><div class=\"qpl-wrap\"><div class=\"qpl-prose\"><h2>Verify the first build against a controlled release<\/h2><p>Setup review links the board revision, BOM variant, placement program, stencil and process instructions. Check polarity and orientation using the intended component and drawing conventions. Verify that the reviewed files are the files actually released to the line. An attractive rendering is not evidence that a feeder, program or physical part matches the release.<\/p><figure><img src=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/quality-planning\/smt-assembly-line.webp\" width=\"600\" height=\"360\" loading=\"lazy\" alt=\"SMT assembly line\"><figcaption>SMT assembly line. Published RAYPCB process photograph; the image does not establish the scope or result of your order.<\/figcaption><\/figure><p>The <a href=\"https:\/\/www.raypcb.com\/first-piece-inspection-procedure\/\">first-piece inspection procedure<\/a> handles the initial build and authorization gate in detail. Repeat the relevant setup review when changes invalidate the previous evidence. A component substitution, program edit or significant tooling change may need a targeted review even when the board part number remains unchanged.<\/p><p>Keep the reaction practical: identify the issue, affected work, responsible owner and authorization needed to continue. First-piece approval is not a lifetime certificate for all later assemblies. Continued process control and product checks remain necessary as materials, equipment condition and operating circumstances change.<\/p><\/div><\/div><\/section><section class=\"qpl-section\" id=\"coverage\"><div class=\"qpl-wrap\"><div class=\"qpl-prose\"><h2>Combine inspection and test without double counting coverage<\/h2><p>SPI evaluates deposited paste characteristics before placement. AOI evaluates programmed visible features. X-ray can help examine selected hidden geometry. ICT and other electrical methods evaluate accessible circuit characteristics; FCT exercises defined operation. These methods overlap in some observations, but they are not interchangeable guarantees.<\/p><p>Choose the method from the requirement and physical access. A hidden interface cannot become visible because an optical program has more inspection points. A correct boot message does not establish every analog output or solder joint. The <a href=\"https:\/\/www.raypcb.com\/resources\/pcb-test-methods\/\">test-method comparison<\/a> helps organize complementary coverage without repeating each specialist article here.<\/p><p>Treat a machine call, confirmed defect and escaped defect as different records. False-call review consumes time but is not itself a defective unit. A later-discovered issue may reveal a coverage or process problem; it should not be removed from the history just because the board eventually passes a retest.<\/p><\/div><\/div><\/section><section class=\"qpl-section\" id=\"tool\"><div class=\"qpl-wrap\"><div class=\"qpl-prose\"><h2>Read first-pass yield without hiding repeat work<\/h2><p>This calculator uses one identified cohort moving through three agreed checkpoints. Each successive count is the number that has passed every checkpoint so far on its first attempt, without repair or repeat processing. These nested counts let the tool distinguish cumulative first-pass yield from the final conforming count after the agreed disposition process.<\/p><p>Interactive engineering tool available on the website.<\/p><p>Do not enter unrelated daily totals, sample-inspection counts or the number of times a machine ran. A board tested three times is still one unit. If the inspection route or cohort changes, separate the populations instead of forcing them into one apparently precise percentage. The result explains arithmetic; it does not establish a benchmark or authorize shipment.<\/p><figure><img src=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/quality-planning\/pcba-first-pass-vs-final-yield.svg\" width=\"1200\" height=\"620\" loading=\"lazy\" alt=\"First-pass performance and final conformity are different\"><figcaption>Illustrative nested cohort: 200 \u2192 190 \u2192 185 \u2192 180. Final conformity after the agreed disposition process is 195; it does not overwrite the first-pass history.<\/figcaption><\/figure><\/div><\/div><\/section><section class=\"qpl-section\" id=\"example\"><div class=\"qpl-wrap\"><div class=\"qpl-prose\"><h2>Example: 90% first-pass and 97.5% final conformity<\/h2><p>In an illustrative cohort of 200 assemblies, 190 pass the first checkpoint without repeat work. Of that first-pass group, 185 also pass the second checkpoint on the first attempt, and 180 pass the third. The cumulative first-pass yield is 180 divided by 200, or 90%. The checkpoint ratios use 200, 190 and 185 as their respective denominators.<\/p><p>If 195 of the original units are finally conforming after the agreed review and any authorized rework, final conformity is 97.5%. That number does not rewrite the first-pass result. Fifteen additional units have reached conformity beyond the untouched first-pass group; investigate the actual records before attributing all of them to one process or repair type.<\/p><p>Five units remain outside the final conforming count. They may be on hold, rejected or awaiting evidence; the yield calculation cannot decide which. Keep counts aligned with physical disposition and do not use \u201cyield loss\u201d as a substitute for the actual status of each unit.<\/p><\/div><\/div><\/section><section class=\"qpl-section\" id=\"standards\"><div class=\"qpl-wrap\"><div class=\"qpl-prose\"><h2>Separate workmanship criteria from functional requirements<\/h2><p>IPC-A-610 addresses assembly acceptability, while J-STD-001 addresses requirements for soldered assemblies. Use the agreed document revisions, class and applicable customer requirements. The <a href=\"https:\/\/www.ipc.org\/TOC\/IPC-A-610J_TOC.pdf\" target=\"_blank\" rel=\"noopener\">IPC-A-610 public contents<\/a> provide a scope reference; actual acceptance needs the applicable criteria and competent interpretation.<\/p><p>The <a href=\"https:\/\/www.raypcb.com\/ipc-standard-for-pcb-assembly\/\">IPC assembly standards guide<\/a> helps turn a general standards request into a usable agreement. A workmanship class does not define a product\u2019s firmware, voltage limits, communication behavior or complete functional test sequence. Those requirements need the product-specific verification plan.<\/p><p>Do not infer medical, automotive or aerospace conformity from an IPC reference alone. Additional product, customer and sector requirements must be identified for the project. Keep evidence requests specific so a supplier can confirm the applicable site, process scope and records instead of answering with a generic quality slogan.<\/p><\/div><\/div><\/section><section class=\"qpl-section\" id=\"reaction\"><div class=\"qpl-wrap\"><div class=\"qpl-prose\"><h2>Preserve failures, rework and retest history<\/h2><p>When a check fails, separate the affected units and record the observed condition before attempting correction. Determine whether the cause could affect other boards from the same setup, material lot or program revision. Containment is about controlling the affected population, not only repairing the unit that exposed the problem.<\/p><p>Rework instructions should identify the authorized action and any limits or additional evidence required. Afterward, repeat the relevant inspection and tests; passing one repeated measurement may not address every consequence of the work. Preserve the original failure, the intervention and the subsequent result as related records.<\/p><figure><img src=\"https:\/\/www.raypcb.com\/wp-content\/plugins\/pcbsync-tools\/assets\/images\/quality-planning\/pcba-nonconformance-reaction-loop.svg\" width=\"1200\" height=\"620\" loading=\"lazy\" alt=\"A repaired unit does not explain the cause by itself\"><figcaption>Keep the original observation, affected population, action and verification linked. Correction and prevention are separate tasks.<\/figcaption><\/figure><p>For recurring problems, distinguish immediate containment from corrective action and verification of effectiveness. Replacing a component can repair a board without explaining why the wrong component was fitted. Customer communication should state the scope and proposed disposition clearly, especially when a deviation from the released requirement needs approval.<\/p><\/div><\/div><\/section><section class=\"qpl-section\" id=\"records\"><div class=\"qpl-wrap\"><div class=\"qpl-prose\"><h2>Make the quality evidence retrievable<\/h2><p>Agree the traceability level before production: order or lot identity may be sufficient for one project, while another needs serial-level test and material relationships. The <a href=\"https:\/\/www.raypcb.com\/resources\/pcba-traceability\/\">PCBA traceability guide<\/a> explains the record structure and retention discussion. A barcode has value only if it resolves to the required evidence.<\/p><p>For functional operation, continue to the <a href=\"https:\/\/www.raypcb.com\/fct-test\/\">FCT execution guide<\/a> for fixture, sequence, software version and per-unit records. Before shipment, use the <a href=\"https:\/\/www.raypcb.com\/fqc-pcb\/\">final inspection and release guide<\/a> to connect product status, quantity, documentation and packaging. This creates a handoff between process control and release instead of another disconnected checklist.<\/p><\/div><\/div><\/section><section class=\"qpl-section\" id=\"questions\"><div class=\"qpl-wrap\"><div class=\"qpl-prose\"><h2>PCBA quality control questions<\/h2><details><summary>Is 100% inspection the same as zero defects?\nNo. It means the specified population was inspected by the stated method. Detection capability, access, program scope and interpretation still limit what the result establishes.<\/summary><\/details><details><summary>Should reworked boards count as first-pass units?\nNo. Keep first-attempt results separate from final conformity after authorized rework and retest. Preserve the unit history so both measures remain interpretable.<\/summary><\/details><details><summary>Does AOI replace functional testing?\nNo. Optical observations and powered product behavior are different requirements. Select complementary methods from the product\u2019s risks and acceptance plan.<\/summary><\/details><details><summary>What should accompany a quality-focused assembly enquiry?\nSend the revision, BOM variant, quantities, critical requirements, inspection\/test expectations and requested records. Identify unclear limits or responsibilities so they can be resolved before release.<\/summary><\/details><\/div><\/div><\/section><section class=\"qpl-section\" id=\"project-review\"><div class=\"qpl-wrap\"><div class=\"qpl-enquiry\"><h2>Review your assembly control plan<\/h2><p>Send the product revision, quantity, required standards and expected records. Identify unresolved limits, methods or responsibilities so the engineering review can address them before quotation or release.<\/p><div class=\"qpl-actions\"><a class=\"qpl-btn\" href=\"https:\/\/www.raypcb.com\/contact\/\">Send your requirements to RAYPCB<\/a><a class=\"qpl-btn qpl-secondary\" href=\"mailto:sales@raypcb.com?subject=PCBA%20Quality%20Control%20review\">Open an enquiry email<\/a><\/div><p class=\"qpl-note\">Attach a downloaded tool brief manually. Contact does not automatically receive these inputs. References reviewed September 2026. Diagrams explain methods; published equipment photographs do not establish project results, certification or included test coverage.<\/p><\/div><\/div><\/section><section class=\"qa-section\" id=\"evidence-review\"><div class=\"qa-wrap\"><div class=\"qa-prose\"><h2>PCBA records that survive a design revision<\/h2><p>Use these fields to scope the report with your quotation. The table is a planning example, not a RAYPCB test result or a promise that every record is included by default.<\/p><div class=\"qa-table\" tabindex=\"0\" role=\"region\" aria-label=\"Report review fields\"><table><caption>Report review fields<\/caption><thead><tr><th scope=\"col\">Record item<\/th><th scope=\"col\">Information to include<\/th><th scope=\"col\">Why it matters<\/th><\/tr><\/thead><tbody><tr><th scope=\"row\">Build identity<\/th><td>BOM, PCB, placement data, variant and firmware revisions<\/td><td>A common part number alone may not identify the fitted configuration.<\/td><\/tr><tr><th scope=\"row\">Inspection coverage<\/th><td>Stages, package groups, recipe and review outcomes<\/td><td>State the features not covered by each method.<\/td><\/tr><tr><th scope=\"row\">Test history<\/th><td>Unit or lot identity, station, program revision, attempt and result<\/td><td>Keep the first attempt visible after an authorized retest.<\/td><\/tr><tr><th scope=\"row\">Rework and release<\/th><td>Reason, approved instruction, affected units and reinspection<\/td><td>The final status must retain the path taken to reach it.<\/td><\/tr><\/tbody><\/table><\/div><details><summary>Walk through an engineering example<\/summary><p>Illustrative review: 100 assemblies enter a test stage; 90 pass first time and 8 of the 10 remaining units pass after authorized correction. First-pass yield is 90%; final accepted yield is 98% if those 98 units meet all release requirements. The second percentage must not replace the first in a process-improvement discussion. Investigate the causes and retain the attempt history.<\/p><\/details><p>Continue to <a href=\"https:\/\/www.raypcb.com\/first-piece-inspection-procedure\/\">set the first-build release gate<\/a>.<\/p><div class=\"qa-actions\"><a class=\"qa-button\" href=\"mailto:sales@raypcb.com?subject=Quality%20scope%20review%20%E2%80%94%20PCBA%20quality%20control&amp;body=Please%20review%20the%20following%20requirements.%0APart%20\/%20revision%3A%0ABuild%20quantity%3A%0ARequired%20check%20or%20characteristic%3A%0AAcceptance%20reference%20and%20revision%3A%0ARequested%20report%20\/%20traceability%3A%0AOpen%20engineering%20questions%3A%0A%0APlease%20identify%20exclusions%20and%20available%20supporting%20records.%0A\">Prepare a quality-scope email<\/a><a class=\"qa-button qa-secondary\" href=\"https:\/\/www.raypcb.com\/contact\/\">Send an enquiry<\/a><\/div><p>The email link opens a draft for you to complete. Contact is a separate form; these pages do not send messages automatically.<\/p><\/div><\/div><\/section><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>PCB Assembly \/ Quality planningRAYPCB \u00b7 Inspection and test planningPCBA quality control: from incoming kit to verified assemblyConnect the approved BOM and assembly revision to first-build checks, inspection, electrical tests and shipment records. Keep first-pass yield, rework and final acceptance visible as separate measures.Review your&hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"full-width.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-8456","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>PCBA Quality Control - RayPCB<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.raypcb.com\/pcba-quality-control\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"PCBA Quality Control - RayPCB\" \/>\n<meta property=\"og:description\" content=\"PCB Assembly \/ Quality planningRAYPCB \u00b7 Inspection and test planningPCBA quality control: from incoming kit to verified assemblyConnect the approved BOM and assembly revision to first-build checks, inspection, electrical tests and shipment records. Keep first-pass yield, rework and final acceptance visible as separate measures.Review your&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.raypcb.com\/pcba-quality-control\/\" \/>\n<meta property=\"og:site_name\" content=\"RayPCB\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-30T07:25:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.raypcb.com\/wp-content\/uploads\/2021\/03\/92b13c369cb2a51-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"582\" \/>\n\t<meta property=\"og:image:height\" content=\"230\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/pcba-quality-control\\\/\",\"url\":\"https:\\\/\\\/www.raypcb.com\\\/pcba-quality-control\\\/\",\"name\":\"PCBA Quality Control - RayPCB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/pcba-quality-control\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/pcba-quality-control\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.raypcb.com\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/92b13c369cb2a51-1.jpg\",\"datePublished\":\"2021-03-25T02:27:25+00:00\",\"dateModified\":\"2026-09-30T07:25:07+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/pcba-quality-control\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.raypcb.com\\\/pcba-quality-control\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/pcba-quality-control\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.raypcb.com\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/92b13c369cb2a51-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.raypcb.com\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/92b13c369cb2a51-1.jpg\",\"width\":582,\"height\":230,\"caption\":\"PCB Assembly Quality Control\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/pcba-quality-control\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.raypcb.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"PCBA Quality Control\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.raypcb.com\\\/#website\",\"url\":\"https:\\\/\\\/www.raypcb.com\\\/\",\"name\":\"RayPCB\",\"description\":\"PCB manufacturer and PCB assembly\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.raypcb.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"PCBA Quality Control - RayPCB","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.raypcb.com\/pcba-quality-control\/","og_locale":"en_US","og_type":"article","og_title":"PCBA Quality Control - RayPCB","og_description":"PCB Assembly \/ Quality planningRAYPCB \u00b7 Inspection and test planningPCBA quality control: from incoming kit to verified assemblyConnect the approved BOM and assembly revision to first-build checks, inspection, electrical tests and shipment records. Keep first-pass yield, rework and final acceptance visible as separate measures.Review your&hellip;","og_url":"https:\/\/www.raypcb.com\/pcba-quality-control\/","og_site_name":"RayPCB","article_modified_time":"2026-09-30T07:25:07+00:00","og_image":[{"width":582,"height":230,"url":"https:\/\/www.raypcb.com\/wp-content\/uploads\/2021\/03\/92b13c369cb2a51-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.raypcb.com\/pcba-quality-control\/","url":"https:\/\/www.raypcb.com\/pcba-quality-control\/","name":"PCBA Quality Control - RayPCB","isPartOf":{"@id":"https:\/\/www.raypcb.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.raypcb.com\/pcba-quality-control\/#primaryimage"},"image":{"@id":"https:\/\/www.raypcb.com\/pcba-quality-control\/#primaryimage"},"thumbnailUrl":"https:\/\/www.raypcb.com\/wp-content\/uploads\/2021\/03\/92b13c369cb2a51-1.jpg","datePublished":"2021-03-25T02:27:25+00:00","dateModified":"2026-09-30T07:25:07+00:00","breadcrumb":{"@id":"https:\/\/www.raypcb.com\/pcba-quality-control\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.raypcb.com\/pcba-quality-control\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.raypcb.com\/pcba-quality-control\/#primaryimage","url":"https:\/\/www.raypcb.com\/wp-content\/uploads\/2021\/03\/92b13c369cb2a51-1.jpg","contentUrl":"https:\/\/www.raypcb.com\/wp-content\/uploads\/2021\/03\/92b13c369cb2a51-1.jpg","width":582,"height":230,"caption":"PCB Assembly Quality Control"},{"@type":"BreadcrumbList","@id":"https:\/\/www.raypcb.com\/pcba-quality-control\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.raypcb.com\/"},{"@type":"ListItem","position":2,"name":"PCBA Quality Control"}]},{"@type":"WebSite","@id":"https:\/\/www.raypcb.com\/#website","url":"https:\/\/www.raypcb.com\/","name":"RayPCB","description":"PCB manufacturer and PCB assembly","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.raypcb.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/pages\/8456","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/comments?post=8456"}],"version-history":[{"count":1,"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/pages\/8456\/revisions"}],"predecessor-version":[{"id":119273,"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/pages\/8456\/revisions\/119273"}],"wp:attachment":[{"href":"https:\/\/www.raypcb.com\/wp-json\/wp\/v2\/media?parent=8456"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}