Quality & acceptance

AOI vs X-Ray vs ICT vs FCT: PCB Assembly Test Methods

Choose inspection and test methods by the failure you need to detect. Compare visible features, hidden joints, electrical networks and operating functions without treating one method as complete coverage.

X ray Machine
X-ray Inspection — existing RAYPCB equipment photograph. Images of hidden joints must be interpreted against the agreed inspection criteria.

The practical decision

Start with failure modes, then choose equipment and access. “100% tested” is incomplete unless it identifies the units tested, the tests performed, the conditions and the acceptance limits.

  1. Identify risksWhat could fail?
  2. Map coverageWhich method detects it?
  3. Provide accessPads + firmware + fixture
  4. Approve limitsResults + retest rules

What each method can and cannot tell you

For the printing stage, use SPI measurements and deposit limits. At the initial build gate, first-piece inspection and release connects the required evidence to a documented decision. These are process stages, not substitutes for the electrical or functional tests below.

Use the table to prepare a coverage discussion. Actual detection depends on the equipment, access, programming, component type and validated test method. The presence of a machine does not demonstrate coverage of every defect on a particular assembly.

MethodUseful forImportant boundary
AOI / visualPresence, placement, polarity where visible and inspectable solder featuresCannot directly see most hidden BGA joints or prove electrical operation
X-rayHidden-joint geometry, selected voiding and bridging conditionsAn image alone does not establish complete electrical or product function
ICTAccessible shorts/opens and selected component/value checksCoverage depends on test access, circuit topology, guards and programs
Flying-probe electrical testAccessible measurements with less dedicated fixture investmentAccess, cycle time and circuit interactions still constrain coverage
FCTPower, communications, outputs and behavior under a defined procedureOnly the tested operating states and limits are demonstrated
Bare-board electrical testConnectivity/isolation of an unpopulated PCB against the referenceDoes not test components, soldered assembly or firmware

Worked planning example: a controller with a BGA and analog input

Illustrative product, not a customer case study: a controller has a BGA processor, a power stage, two analog inputs and a communications port. Use inspection for placement and solder features; discuss X-ray scope for the hidden joints. Electrical checks can target supply nets and accessible components. Functional tests should define supply current, known input stimuli, measured outputs and communications behavior.

RiskProposed discussionEvidence still needed
Incorrect firmwareProgram a controlled image and read back identityApproved binary, revision and verification method
Analog channel errorApply known inputs and compare outputs to limitsStimulus accuracy, loads, limits and calibration requirements
Intermittent connectionReview the defect mechanism and suitable test conditionsProduct-specific stress/reliability plan if required
Hidden solder defectChoose views, sampling and disposition rulesAgreed inspection criteria; correlation with other tests

Make test access part of the design release

Supply a schematic, netlist where applicable, test-point map, connector pinout, fixture interface and safe power-up sequence. Identify sensitive nets and allowable probing conditions. For FCT, include firmware, equipment requirements, stimuli, measurable limits and expected cycle time. A functioning demonstration board is useful, but it is not a complete repeatable test procedure.

For the functional part of the plan, use the functional test guide to prepare the procedure and fixture discussion.

Define failed-test handling before the first build

Keep the failed result, diagnostic action, rework authorization and retest result linked. Specify when a retest is allowed and whether the full sequence or only affected checks must run again. The same unit should not lose its failure history because it later passes. Review escapes and false failures separately when improving the plan.

Define the identifiers and record relationships with the PCBA traceability checklist.

Prepare a test-plan discussion

This optional tool prepares a discussion using your inputs. It does not approve the design, place an order or upload project files. You can contact engineering directly without completing it.

RAYPCB ENGINEERING

Assembly Test Plan Builder

Project Preparation
Loading Assembly Test Plan Builder…
Using this tool & sharing results

Use the stated units, input limits and model assumptions. Results support an engineering discussion; they do not approve a design, process or production order.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

Working document

Prepare your handoff checklist

Open the editable text worksheet, save a copy and record the requirement, owner and evidence for each item. Keep unanswered points visible when requesting review.

  1. Product failure modes and critical functions
  2. PCB/PCBA revision and schematic
  3. AOI/X-ray scope and acceptance criteria
  4. Electrical access and test-point map
  5. FCT stimuli, firmware, loads and pass/fail limits
  6. Fixture/program owner and validation plan
  7. Sampling, serial or lot linkage and record format
  8. Rework, retest and unresolved coverage gaps

The Contact page is a separate enquiry step. Attach your completed worksheet and relevant files there using its available submission options; this page does not automatically transfer your answers.

Questions before you release the files

Can AOI replace ICT?

No. Visible-feature inspection and electrical measurements detect different defect classes. Choose the combination from the risks and available access rather than treating one as a universal replacement.

Is FCT the same as reliability testing?

No. Production FCT normally checks defined functions under specified conditions. Environmental, life or reliability qualification is a separate plan when required.

Should prototypes use the full production fixture?

Not always. Balance the validation need, fixture development effort, access and expected future volume. Agree a prototype test scope and document any gaps before using the results to release production.

Continue with the next engineering task

Technical references

A coverage matrix for a mixed-signal controller

Use these fields to scope the report with your quotation. The table is a planning example, not a RAYPCB test result or a promise that every record is included by default.

Report review fields
Record itemInformation to includeWhy it matters
Wrong or reversed visible partAOI or appropriate visual reviewProgram and review depend on distinguishable visible features.
Hidden solder geometryAppropriate X-ray viewsImage interpretation needs a defined region and acceptance basis.
Accessible component/network valueICT or suitable flying-probe measurementTopology and access constrain isolation and interpretation.
Loaded output or communicationFunctional testSpecify firmware, mode, stimulus, load and observed limits.
Walk through an engineering example

Illustrative planning: a BGA controller also has a precision analog output. X-ray can address selected hidden-joint geometry, while a calibrated loaded-output test addresses the analog requirement. Neither result substitutes for the other. Map both records to the same configuration, and document conditions the plan does not test.

Continue to place the selected methods into an assembly control plan.

The email link opens a draft for you to complete. Contact is a separate form; these pages do not send messages automatically.

Compare coverage before comparing inspection cost

A low inspection price is useful only when the scope answers the required question. List the failure modes or characteristics the plan needs to address, then identify the method, access condition and observable result for each. A fast optical inspection may cover many visible features, while a slower electrical measurement answers a different question. Do not count the same easy-to-inspect feature several times and mistake the total for broad coverage.

Separate setup work from recurring work. Programming, fixture design, adapters, reference samples and validation can matter greatly on a first build. Handling, measurement cycle, review of calls and authorized retesting affect recurring effort. A design change can repeat part of the setup. Ask suppliers to identify the assumptions behind the comparison and the work excluded from each option. The flying-probe cost comparison tool accepts your own allowances for an equivalent-scope comparison.

No coverage percentage is meaningful without a denominator. It might refer to components, unique nets, solder joints, tested requirements or a defined fault list. These categories cannot be added together as though they were the same unit. Keep inaccessible and unresolved items visible. Where a gap is accepted, identify the responsible decision maker and the reason rather than silently marking it as tested.

Different inspection and test methods observe different characteristics
Conceptual map of complementary evidence; no method provides universal defect coverage.

Validate the test plan as the product matures

During an early prototype, the design may not yet provide final test points, software commands or fixture interfaces. Use the build to discover practical access and observability problems, while keeping the results tied to the prototype configuration. A workaround suitable for a few boards may not be repeatable for production. Record those gaps as design actions rather than hiding them inside a test procedure that depends on undocumented operator judgment.

Before a repeated production build, confirm the test requirements, program revision, equipment configuration and response to a failure. The team needs a controlled way to distinguish a product failure from a connection, fixture or measurement problem. Where reference units or fault-insertion exercises are used, define their purpose and limitations. A known-good unit can help check a setup, but it cannot prove that every possible defect would be detected.

Change control continues after launch. A component substitution, firmware update, fixture repair or new program can affect the meaning of the result. Define the revalidation work according to the change and keep the old and new configurations identifiable. Do not compare yield trends without checking that the tested population, limits and test sequence remained comparable.

Read the combined result without losing its limits

Functional testing workstation from the RAYPCB equipment library
Existing workstation reference. Required fixtures, programs and product coverage are agreed per project.

Imagine a controller with a hidden-joint processor, a communication interface and a power output. Optical inspection checks the visible assembly features in its program. X-ray examines the selected hidden joints using agreed views. Electrical tests check accessible networks or components. A powered test exchanges a defined message and measures the output under a specified load. Each record answers a different part of the release requirement; the combined plan should state what is still outside its scope.

A board can pass the communication exchange and still fail the loaded output requirement. It can pass a production screen and still require separate environmental or life testing for design qualification. Preserve this distinction in the shipment summary. A clear report names the completed checks and exceptions, allowing engineering and purchasing to decide on the actual evidence rather than an unexplained “fully tested” statement.

For a quotation, share the current assembly data, firmware requirements, intended modes, critical measurements and any existing test procedure. If some limits are undecided, identify them as open questions. Continue to assembly layout and test access when access or observability must be designed into the next revision, or use Contact to discuss the implementation scope.