PCB Manufacturing / PCB drilling

RAYPCB · FABRICATION REQUIREMENTS

PCB annular ring: plan for registration

See how pad size, production drill diameter and radial registration allowance affect remaining copper. Prepare useful questions before shrinking a via or connector land.

Original engineering guidance · References checked September 26, 2026

Registration narrows one side of the ring
The remaining copper is asymmetric when the hole and land centers differ. This is conceptual drilling-stage geometry.

What is an annular ring on a PCB?

An annular ring is the copper land remaining around a hole. For an ideal centered circular geometry, its radial width is half the difference between the land diameter and the relevant hole diameter. In a manufactured board, registration and dimensional variation can make the ring narrower on one side. The minimum remaining region is therefore more informative than the nominal centered picture.

This page focuses on geometry and manufacturing questions for mechanically drilled holes. It does not assign a universal IPC minimum or approve a particular via. Internal and external features can require different dimensional references and acceptance rules. Confirm the applicable construction, standard revision, class and drawing before turning a planning result into a release criterion.

If your immediate question concerns drill types or the process sequence, use the PCB drilling guide. If you need to choose a plated or non-plated opening, use PTH vs NPTH. Keeping those decisions separate makes it easier to identify what an annular-ring calculation actually tells you.

Diameter difference is not radial ring width

For a centered circular land of diameter P and a circular opening of diameter D, the geometric radial ring is (P − D) / 2. Subtract a radial center offset e to estimate the narrow-side remainder. This simple circle model is useful for understanding sensitivity, but it does not represent every finished feature or replace the applicable inspection definition.

The worksheet uses an explicitly entered production-drilled diameter for the drilling-stage geometry. A finished plated hole is smaller than the production opening because the wall receives deposited material. Substituting the finished-hole diameter into an internal drilling-clearance calculation can overstate the available copper. Ask the fabricator which diameter supports the intended layer and requirement.

Do not subtract a diametrical position-tolerance number as though it were a radial center offset. Likewise, independent X and Y coordinate limits do not automatically equal a single radial allowance. The worksheet expects a radial allowance that has already been interpreted by the responsible engineer. It does not convert geometric tolerancing frames or statistical registration data.

Use radial quantities consistently
The worksheet uses minimum land, maximum production-drilled opening and a separately interpreted radial allowance.

Explore pad, drill and radial registration allowance

Enter the nominal and minimum land diameters, nominal and maximum production-drilled diameters, and radial registration allowance. The result includes the centered nominal ring, a geometric worst-case narrow-side remainder and the difference between them. Negative remainder means the assumed circles overlap beyond the land boundary; it is a geometry warning, not a complete IPC disposition.

RAYPCB ENGINEERING

Annular Ring Registration Explorer

Fabrication Requirements
Loading Annular Ring Registration Explorer…
Using this tool & sharing results

Use the stated units, input limits and model assumptions. Results support an engineering discussion; they do not approve a design, process or production order.

After changing inputs, update the result before using it. Where a download or copy action is available, review that brief and attach or paste it into your enquiry. Opening Contact does not transfer these inputs or send a request.

How to use and share tool results

The drawing updates after calculation so you can see the consequence of a larger hole or offset. Values are deliberately labeled as a planning model. The illustration is scaled to the entered geometry, but it omits plating profiles, land distortion, conductor junctions and other real manufacturing effects. Download the inputs and result to discuss those limitations with engineering.

An illustrative 0.70 mm nominal pad and 0.35 mm production drill give a centered nominal ring of 0.175 mm. If the minimum pad is 0.68 mm, maximum drill is 0.37 mm and radial allowance is 0.05 mm, the narrow-side estimate becomes 0.105 mm. These inputs are examples, not a process capability or an acceptance threshold.

Internal and external copper need the correct reference

The opening seen from the finished outside surface does not reveal the complete internal connection. Internal lands were intersected by the drilled opening before the final hole-wall deposition. The external surface can also include additional processing. Identify the relevant layer and acceptance definition instead of assuming that one top-view measurement describes every land in a multilayer board.

Altium's via and pad guidance distinguishes dimensional references used in annular-ring planning and discusses manufacturing allowance. Use such design guidance to frame the question, then verify the actual requirement against the authorized standard and the supplier's reviewed construction. A tutorial's convenient default should not become an unexamined purchase-order limit.

For multilayer PCB construction, the relative positions of internal features matter as well as the drill location. Material movement and layer registration belong in the manufacturing assessment. A nominal pad enlarged on one layer does not automatically solve a more restrictive land elsewhere along the hole span.

Fine-pitch circuit-board pad array
Existing RAYPCB pad-array photograph. Hidden hole geometry and layer registration require separate verification.

Practical changes to discuss before shrinking a pad

Increasing land diameter can improve geometric allowance, but it also consumes routing space and may change local copper clearances. Reducing the hole can help one geometry while affecting aspect ratio, plating, current path or component fit. Evaluate the surrounding system rather than optimizing the ring as an isolated number.

For connector holes, begin with the finished-hole and land requirements for the selected component. A soldered pin and a press-fit contact use different mechanical conditions. Do not reduce a connector hole merely to recover annular-ring margin. Bring the component drawing, board thickness and hole specification into the same review.

Teardrops can alter the copper transition between a conductor and a land. They do not move the hole back to the center, increase every part of the ring equally or eliminate the need for registration allowance. If they are proposed, review their effect on clearances and the actual land-to-trace connection rather than treating them as a universal cure.

Blind vias, microvias and filled structures need a different review

This tool's two-circle model is not a laser-microvia qualification engine. A microvia can involve taper, target and capture features, fill and stacking conditions that are not described by a single mechanically drilled diameter. For those structures, use the HDI PCB engineering route and review the actual layer-to-layer construction.

Filling or capping a via addresses a specified finished structure; it does not by itself repair an inadequate internal connection or justify smaller lands everywhere. If surface planarity or via-in-pad construction is required, include the relevant protection definition and evidence. Keep the annular-ring requirement separate from the fill material and finished cap requirement.

Before reducing the via geometry
The circle model is a planning aid and does not establish class compliance or microvia reliability.

The useful manufacturing question is not simply “how small can this via be?” It is “which construction meets the connection, routing, thermal and inspection requirements with an agreed process margin?” That question can lead to different solutions for a dense signal escape, a thermal path and a component lead.

Geometry is one input to acceptance

A calculated positive remainder does not prove compliance. The applicable specification can distinguish feature type, layer, class and the relationship between the land, hole and conductor. Obtain the authorized current or contractually required text and define the inspection evidence. Do not rely on a table copied from an unrelated website without its scope and revision.

The IPC-6012 reference page explains how rigid-board requirements, construction and acceptance records fit together. The official IPC-6012F contents identify the document scope. This page intentionally does not turn an unsupported numeric threshold into an IPC pass/fail rule.

Where a concern arises, preserve the board identity, layer, hole group, observation and measurement basis. A photograph can help locate the issue, while the appropriate inspection method supplies evidence about the actual feature. Resolve whether the issue is a design allowance, manufacturing variation, interpretation or measurement problem before deciding the corrective action.

Ring margin affects more than artwork area

A more demanding land-to-hole relationship can influence drilling and registration control, material choice, inspection and yield. The cost depends on the overall stackup and feature population. A board with a few critical connector features can require a different review from a dense field of very small vias. Avoid assuming that one minimum advertised number applies to both.

Give the supplier the pad stack, finished-hole requirement, relevant layers and critical net or component function. Ask which allowance is already included in the proposed process and which remains a design responsibility. This prevents double-counting compensation or, in the opposite direction, omitting it entirely.

For a complete PCB Manufacturing quotation, include the reviewed geometry with the material, layer count, quantities and acceptance requirements. Use the worksheet as a discussion attachment. The exact production drill selection and manufacturing compensation should remain part of the agreed fabrication engineering process.

Multilayer circuit-board panel with exposed pads
Existing RAYPCB multilayer product photograph. The image illustrates board construction, not measured tolerance or approval.

Annular-ring questions engineers often need to resolve

Is annular ring the same as pad diameter minus hole diameter?

That subtraction gives a diametrical difference. For a centered circular geometry, radial ring width is half of it. An offset then reduces the narrow-side remainder. Be explicit about radial versus diametrical quantities when moving between drawings, calculators and supplier guidance.

Can I use finished hole size in every calculation?

No. The relevant diameter depends on the layer and the requirement being evaluated. This worksheet uses production-drilled geometry and labels it accordingly. Ask for the correct drilling-stage value rather than estimating it from a generic plating allowance for an unknown process.

Does a negative result automatically mean an IPC rejection?

It means the entered geometric assumptions predict a boundary crossing. That is a reason for review. Actual acceptance requires the correct feature definition, applicable standard and real inspection evidence. The tool does not determine whether a particular observed condition is acceptable under a specific contract.

What should accompany an annular-ring review request?

Include the board revision, hole group, land dimensions by layer, finished-hole requirement, proposed production drill if available and the critical function. State the source of any registration allowance. If that value is unknown, mark it unresolved rather than choosing a reassuring number.

Get a review against your drawing

Send the board revision, construction, quantity and the manufacturing or inspection question you need reviewed. Identify unresolved requirements so the response can address them.

Send requirements for review

Optional: attach the downloaded worksheet manually. This guidance does not certify a design, approve a shipment or replace the applicable authorized standards.