RAYPCB · Package engineering
Package on package assembly: two interfaces to control
Plan the upper and lower package interfaces, stack height, placement route and hidden-joint inspection. Prepare package-specific evidence for a PoP assembly review.
Preliminary files and open process questions are welcome.
What is package on package assembly?
Package on package assembly, usually shortened to PoP, connects an upper semiconductor package to a compatible lower package, with the lower package attached to the PCB. It is a package-level stack, not simply two chips placed close together or two bare dies combined inside one package. A common purpose is to combine processing and memory while controlling the board footprint and interconnect arrangement.
Two solder interfaces must be considered: the board-to-lower-package interface and the lower-to-upper-package interface. They have different land patterns, thermal conditions and inspection challenges. Choosing parts with matching external dimensions is not enough. The paired devices must have compatible electrical functions, ball maps, metallurgy, mechanical drawings and assembly instructions for the intended configuration.
Start with the package pair, not a generic ball pitch
| Interface | Required information | Question to resolve |
|---|---|---|
| PCB to lower package | Current land pattern, board stackup, solder mask, finish and escape routing | Can the board be fabricated and assembled to the package-specific requirements? |
| Lower to upper package | Mating ball map, land sizes, package outlines and solder materials | Are these exact ordering codes a supported combination? |
| Complete stack | Mounted height, dynamic warpage, thermal route and enclosure boundary | What must be demonstrated on the actual assembly? |
| Test access | Boot, memory, power and diagnostic requirements | Which connections or failures can the agreed tests observe? |
Treat the PCB land pattern and the top-package interface as separate controlled definitions. A lower package may share an external outline with another device while differing in memory compatibility or top-side connections. Preserve the manufacturer part numbers and package revisions in the BOM. If a component substitution is proposed, review both interfaces instead of assuming a matching footprint means interchangeability.
PCB escape routing, reference continuity and power delivery also affect the design. A stack-height result says nothing about those requirements. Begin with the BGA assembly and design review for board-side joints, then add the second interface, package-pair evidence and inspection plan required by PoP.
Calculate the mechanical height envelope
Use non-overlapping dimensions from the package drawings and mounting definition. In this worksheet, lower landing height is the distance from the PCB top surface to the mating plane on the seated lower package. It already includes the board attachment contribution. Add the collapsed upper solder-joint height and upper package body height, then compare the worst-case total with the minimum available enclosure height.
PoP Stack-Height Tolerance Worksheet
For an illustrative stack, use a lower landing height of 0.90 ±0.05 mm, upper joint height of 0.15 ±0.03 mm and upper body height of 0.50 ±0.04 mm. The nominal total is 1.55 mm and the sum of upper extremes is 1.67 mm. Against a minimum available 1.80 mm, the calculated remaining clearance is 0.13 mm. A drawing that already gives total mounted stack height should be used directly; do not add its constituent heights a second time.
This is a mechanical arithmetic screen. Board bow, local support, connector forces, thermal expansion and enclosure tolerances may consume the apparent margin. Dynamic package warpage during reflow is a different problem from final stack height. The worksheet does not approve mating compatibility, solder collapse, board-level reliability or the minimum clearance required by the product.
Choose and qualify the actual assembly sequence
In a simultaneous route, the lower package is placed on the PCB and the prepared upper package is placed onto it before the assembly passes through reflow. A pre-stack route first joins the packages, then attaches that stack to the PCB in a later operation. The correct choice depends on the particular components, equipment, materials, handling and qualification evidence.
TI's SWPA156 application report documents an OMAP3/companion-memory example and discusses assembly options, deposition and warpage. It is a 2009 device-specific reference, not a current universal PoP recipe. Use it to understand the variables, then obtain the current package-pair guidance and agree trials for the actual design.
The upper package may require an approved flux or paste transfer operation. The transfer method, amount, tack and placement conditions need controlled development; an arbitrary dip depth copied from a different package can produce a different deposited volume. Record the material identification and process reference alongside the package pair. Underfill and conformal coating are optional project-specific choices, not mandatory steps in every PoP assembly.

Warpage and moisture cannot be reduced to one room-temperature number
Two packages that appear flat at room temperature can move differently during heating. The relative separation at corresponding terminals matters when solder is expected to form a joint. A gap that exceeds what the deposition and collapse process can accommodate may produce a non-contact defect even when the placement machine reports a successful placement. Dynamic data should be evaluated over the relevant thermal sequence.
Record component moisture sensitivity, storage condition, exposure history and any baking requirements from the applicable component and handling instructions. Avoid assuming that all parts supplied on one reel or in one tray have the same processing history. If pre-stacking or rework adds thermal cycles, include them when checking the qualified process for both the lower and upper device.
The profile must work for the whole stack and the surrounding board. Measuring an accessible board location does not automatically reveal the temperature at both hidden interfaces. Decide sensor locations and attachment methods as part of the development plan. The double-sided assembly process guide is relevant when PoP is combined with a second board-side reflow, but does not replace PoP-specific validation.
Define what inspection can actually reveal
Optical inspection cannot directly view all joints under a package stack. X-ray projection can help identify geometry and some defects, but overlapping upper and lower ball arrays can complicate interpretation. Inspection views, resolution, separation of interfaces and any sectional method should be selected for the particular package and suspected failure mode. “X-ray included” is incomplete without an agreed scope and interpretation plan.
Electrical test and functional exercise provide complementary evidence. A board that boots once has not necessarily exercised all relevant connections, memory patterns or environmental conditions. Define which tests are intended to detect assembly defects and which demonstrate application behavior. Development samples may need additional investigation that would not be performed on every production unit.
Use the PCB X-ray inspection guide to discuss imaging limits and the functional test planning page to define powered checks. Retain the package-pair identification, inspected interface and acceptance criteria with the records so a later revision can be evaluated consistently.

Budget for development and verification, not only placement
PoP cost can include package procurement, handling controls, transfer setup, tooling, process development, special inspection and test. Separate these expenses from the rest of the PCBA so the quote does not accidentally count the same board or component twice. A small first order may carry setup work that changes the apparent per-unit cost; later lots still require the released process and incoming-material controls.
PoP Budget and RFQ Brief
The budget brief uses your sourced allowances. With all cost fields empty it prepares a technical enquiry; it does not invent a market price. A complete allowance set can illustrate the requested build total, but does not predict assembly yield or component availability. Specify whether the unit allowance includes the package pair, bare board and general assembly, or only the PoP operation. Record exclusions explicitly.
If package compatibility, dynamic warpage data or inspection feasibility is unresolved, ask for a staged engineering review before treating a volume unit price as firm. Share the minimum useful files even if the design is preliminary. A direct enquiry remains available without using either tool.
Build a package-specific enquiry
Supply exact lower and upper ordering codes, device data sheets, package drawings, recommended land patterns, board fabrication data, BOM and placement files. State the required quantity and the phase of the project: feasibility, prototype, pilot or repeat production. Include the proposed solder materials and existing process evidence when they are known; identify open choices rather than filling them with guesses.
Add the enclosure-height restriction, operating environment, assembly history and required test outputs. If only a limited number of expensive devices are available, state that constraint before defining process trials. Agree how rejects, analysis samples and any replacement parts will be handled. These commercial details influence a credible development plan as much as a nominal ball pitch.
Review the required PCBA files for the common manufacturing package. RAYPCB's PCB assembly service can be the broader enquiry route when PoP is one part of a larger populated-board build. Device-specific feasibility is confirmed through project review rather than implied by this educational page.
PoP assembly questions
Does a matching package outline prove that two devices can be stacked?
No. Electrical compatibility, mating ball map, pad geometry, metallurgy and manufacturer support must also match. Maintain exact part and package revisions, and review proposed alternatives before procurement or placement.
Is underfill always required for package on package assembly?
No. Its need, type and application depend on the package guidance and reliability requirements. Underfill affects rework and material compatibility. Specify it only as part of an approved assembly definition, not as a generic completion step.
Can a two-dimensional X-ray prove every PoP joint is sound?
No. Overlapping structures and the failure mechanism limit what a projection can establish. Define the views and complementary tests needed for the design, and document uncertainties rather than treating a ball image as proof of all electrical connections.
Is the stack-height tool a warpage simulator?
No. It sums explicit dimensional bounds for a final mechanical envelope. Dynamic warpage, wetting, joint collapse and thermo-mechanical reliability require package data and process evaluation.
Can the top package be replaced later?
That is a process-development question. Access, material choice, accumulated thermal exposure and the effect on the lower interface must be reviewed. Do not assume a replaceable package architecture guarantees a low-risk board-level repair.
Request a PoP feasibility review
Send the drawing revision, BOM, quantity and the process question you need resolved. Include component instructions, mechanical restrictions and required inspection or test records where relevant.
Tool use is optional. Attach any downloaded brief manually; Contact does not automatically receive worksheet inputs. References reviewed September 2026. Illustrations are explanatory, and photographs are not process qualification records.