RAYPCB · Embedded power review
System-on-Module Carrier PCB Power Tree: Sequencing and Peak Demand
A carrier power tree is more than a sum of voltage multiplied by current. It must show which source supplies each load, when that load becomes active, how the module controls peripheral power and what happens when one domain is off.
Use this review to connect a module’s hardware requirements to converter sizing, startup behavior and test evidence. The worked numbers are hypothetical. They are not supply recommendations for any particular compute module.
Define the module boundary before drawing rails
Start with the exact module model, revision and configuration. Identify which rails are generated on the module and which inputs the carrier must supply. A processor’s internal core sequence is not automatically a task for the carrier. Conversely, a module with one main supply can still impose requirements on input rise time, reset, peripheral enables and shutdown.
Record the supported input range at the module connection, including tolerance and transient requirements from its documentation. Check whether a backup input, reference output or always-on supply has special conditions. An output reference intended for small interface loads should not be treated as an unlimited auxiliary regulator.
The Toradex carrier design guides separate their module families and supporting references. The Verdin guide, for example, treats module power states, peripheral control and backfeeding explicitly. Those details demonstrate why a familiar connector or form factor is insufficient evidence of power compatibility. Apply the guide matching the actual module, rather than copying another family’s voltage limits.
The existing Raspberry Pi carrier layout guide covers Compute Module selection and retained interfaces. This article goes deeper into the relationship between load demand and sequencing across a generic carrier; it does not replace that device-specific selection work.
Make a power inventory without counting a load twice
List each distinct downstream load once for one defined operating state. Separate module demand, storage, cameras, communication devices, fans and externally powered accessories. Record the evidence behind each current: measured workload, specified maximum, estimate or unverified placeholder. A blank current is unknown, not zero.
Then map the loads to converters. Sum downstream output power and divide by the relevant conversion efficiency to estimate that converter’s input power. If converters are cascaded, walk upstream stage by stage. Do not include both a converter’s input and all its outputs in the same final source sum, because that counts delivered energy twice.
| Branch | Load at output | Assumed efficiency | Source contribution |
|---|---|---|---|
| Main module branch | 5 V × 3 A = 15 W | 90% | 16.67 W |
| Peripheral branch | 3.3 V × 1 A = 3.3 W | 88% | 3.75 W |
| Total of distinct branches | 18.3 W delivered | Calculated per branch | 20.42 W from source |
At an illustrative 10.8 V input, the source current is approximately 20.42 W ÷ 10.8 V = 1.89 A. Adding a declared 25% planning reserve gives approximately 2.36 A. The reserve is an example assumption, not an industry rule. It does not cover an unspecified startup surge, connector limit or thermal derating automatically.
Check whether the two branch peaks actually overlap. If firmware can start a camera while the module and storage are already busy, that combination may be a real operating case. If the design prevents concurrency, document the interlock and test it. Do not average mutually different modes into a single current that hides the largest load step.
Converter loss also enters the thermal review. In this example, the difference between 20.42 W input and 18.3 W output is approximately 2.12 W across the two converters. Their individual losses occur in different locations. Actual efficiency varies with input voltage, load, switching conditions and temperature, so a spreadsheet value needs confirmation on the selected parts.
Check voltage at the receiving pins during a load change
A regulator output test point is not necessarily the voltage seen by the module. Connectors, protection switches, current-sense elements, vias and copper contribute to the path. Mark measurement points at both ends and decide which reference connection belongs to each measurement. This separates source regulation from distribution loss.
For an illustrative 3 A step through a 40 mΩ path, the resistive drop is 0.12 V. That is only the steady resistive component. Wiring inductance, regulator response and local capacitance affect the transient. A source set to the nominal module voltage may therefore fail the module’s minimum input requirement even while a remote multimeter looks normal.
Use a scope setup appropriate to the signal and location, with short probing connections and a defined bandwidth. Record the workload transition, input source, cable, temperature condition and board revision. Compare the waveform at the receiving pins with the module’s limits. Avoid declaring a design stable from one convenient idle measurement.
For a temporary first-order charge estimate, ΔV ≈ ΔI × Δt ÷ C assumes the capacitor alone supplies the extra current during that interval. Effective capacitance, ESR, ESL and regulator response change the result. This relation is useful for identifying missing assumptions; it does not select a production capacitor or establish control-loop stability.
Write the startup contract as states and conditions
Define the allowed order using the module documentation: input valid, module startup, peripheral power permission, peripheral rails valid and reset release. Names and polarity vary. Identify whether each control is an input or output, open-drain or push-pull, and which domain supplies its pull-up. A signal called power-good is not automatically compatible with the next enable pin.
Distinguish an elapsed delay from an observed voltage condition. A fixed RC delay can expire even if the preceding rail has not reached its valid level. A sequencer or monitored power-good path can address different requirements, but thresholds, tolerances, pull-ups and failure behavior still require review. Analog Devices AN-1311 compares sequencing approaches and highlights the role of monitored conditions.
The diagram is a conceptual dependency order, not a timing specification. Write numerical limits only from the chosen module, regulators and peripherals. Include what happens if a rail never becomes valid: remain in reset, shut down, retry under a defined policy or report a fault. Unlimited reset cycling should not become an accidental operating mode.
Review startup current separately. For an ideal 470 µF load charged from 0 to 5 V in 5 ms, I = C × ΔV/Δt gives 0.47 A of capacitive charging current, before active load current. Charging it in 0.5 ms gives 4.7 A. These illustrative values explain why a circuit can run normally once started yet trip a source during connection.
TI’s load-switch discussion explains controlled rise time and sequencing. Confirm the chosen device’s allowable capacitance, current limit, safe operating conditions and discharge behavior. Slowing every rail indiscriminately can violate a module’s own ramp requirements.
Review shutdown, sleep and externally powered peripherals
Draw the off-state as carefully as the running state. Which rails remain powered after a software shutdown? Which peripherals can still drive a signal? Is an external debugger, USB connection or independently supplied sensor present? A rail switched off by its regulator can still receive energy through another connection.
The Verdin carrier design guide, section 3.5, explains backfeeding between power domains. The general review question is whether an active output or pull-up can raise an unpowered input domain through an unintended path. Residual voltage can interfere with a clean reset even without an obvious short circuit.
Check the selected interface devices for permitted powered-off behavior. Possible design measures include controlled isolation, an appropriate buffer or level translator, coordinated power states and reverse-current protection. None is universal: a device labeled as a level shifter may still have an unsuitable off-state path. A series resistor alone does not prove absolute-maximum limits are respected.
Include power-down ordering and discharge in the specification. Identify the condition required before restart, and test rapid removal and reapplication of input power. Storage and application software may need a separate graceful-shutdown sequence; electrical power control does not itself guarantee filesystem integrity.
Turn the power tree into a repeatable bring-up record
Before fitting an expensive module, check the released assembly for orientation, shorts and fitted power components using the agreed procedure. Use suitable current-limited equipment during controlled bring-up, while recognizing that an overly low current limit can itself create startup cycling. Test conditions need to distinguish equipment-induced behavior from a board defect.
- Input and branch verification: record actual voltages, enable states and idle currents at named points.
- Startup capture: observe input, module supply, peripheral enable and reset together where possible.
- Concurrent workload: exercise the load combination used in the budget, with the intended peripherals connected.
- State transitions: test sleep, reset, shutdown and restart according to supported product behavior.
- External-power cases: check relevant attached interfaces while one domain is off.
Keep a fault log with expected and observed behavior. If an input droop coincides with reset, determine whether it begins at the source, in a distribution segment or at a downstream regulator. Replacing the supply with a larger bench instrument may hide a cable or startup issue instead of resolving it.
Current ratings also have physical boundaries. A connector’s aggregate capacity does not imply every contact shares current equally, and a regulator’s headline rating may require thermal conditions unlike the enclosure. Route, copper distribution, component cooling and assembly constraints belong in the same review.
What to send for a carrier manufacturing review
Provide the schematic power tree, fabrication data, stackup, BOM, placement file and module procurement responsibility. Identify current-carrying connections, test points and the functional tests included in the requested board assembly scope. A test plan attached to an enquiry is more useful than an unsupported instruction to test everything.
Use the industrial PCB requirements guide for the surrounding environment and construction questions. If the module connection requires dense escape routing, review that separately with the HDI fabrication route. A power calculation alone does not establish the required layer count or via technology.
Questions that often change the design
Does one module input mean no sequencing is needed?
No. Internal rails may be handled by the module, while carrier peripherals, reset, input ramp and shutdown still have defined requirements.
Can a fixed percentage reserve replace peak-load testing?
No. A reserve states a budgeting assumption. It cannot establish the duration, concurrency or waveform of a peak that has not been characterized.
Why does a switched-off rail still show voltage?
Stored charge, leakage or a backfeeding path may be involved. Identify the source under controlled conditions rather than assuming the regulator has failed.
Reviewed 11 October 2026. All numerical examples are hypothetical calculations. Diagrams show dependencies, not measured waveforms or an approved module circuit.