A practical supplier qualification worksheet
| Ask the manufacturer | Useful evidence | What not to infer |
|---|---|---|
| Which facility will make this construction? | Manufacturing entity, site and agreed subcontracting scope | A group logo does not identify the producing site. |
| Has a comparable regional construction been reviewed? | A permitted example or anonymized regional cross-section with its scope | A product photo does not prove its layers or hole structure. |
| How are engineering changes approved? | Revision-controlled clarification and approval route | A price confirmation does not approve a material substitution. |
| What inspection and test are included? | Coverage, acceptance criteria, sampling where applicable and report agreement | A list of machines does not specify order-level inspection. |
| How will the lot be identified? | Agreed marking, traceability and release documents | A certificate alone does not document a shipped lot. |
Use the same worksheet for every offer. Separate evidence already reviewed from evidence requested and exceptions still open. For a RAYPCB project, pair the construction review with the quality documentation review before approving the order.
Continue with the next engineering decision
Send a complete project brief
Include the flat outline and installed view, layer/region mapping, material grades, finished thicknesses, bend duty, copper artwork, drill information and quantities. Add the BOM, placement file and acceptance requirements when assembly is included.
Mark unresolved choices rather than guessing. Download tool results if they help describe your request. Contact does not automatically receive calculator inputs.

