RAYPCB · ENGINEERING GUIDE
Microvia Design and Cost: Compare the Manufacturing Route
Microvia design and cost are linked through the construction you ask a fabricator to produce. Diameter alone does not determine the price. Layer access, build-up stages, filling, cap requirements, materials, panel utilization and inspection all contribute. Compare reviewed manufacturing routes rather than applying a generic percentage premium to every HDI board.

Define the design problem first
Identify which package or transition requires a microvia and what cannot be achieved with the current routing rules. Record the layer endpoints, dielectric depth, target land and surface pad requirements. That creates a basis for comparing alternatives without confusing a smaller hole with a complete design solution.
A microvia may improve local escape while leaving the remainder of the board conventional. Conversely, a difficult layer-access requirement may force changes throughout the manufacturing route. Map that dependency before deciding which feature to relax in a cost reduction exercise.
Break the quotation into comparable scope
Ask for a common quantity, outline, material basis, delivery condition and inspection requirement. Identify one-time engineering or tooling, recurring board value, additional interconnect operations and any separately quoted qualification. A quotation with more testing is not directly comparable to one that omits it.
Do not count a separate press cycle for every visible microvia or for each side without reviewing the proposed route. Both sides can be processed within a stage in some constructions. The HDI multilayer guide explains why build-up notation is not a complete manufacturing traveler.
Use an entered-cost scenario
The tool adds quantity times the entered recurring board value, plus entered setup, process-route, inspection and logistics allowances. These are your inputs, not RAYPCB prices or market averages. The output is useful for exposing the contribution of fixed work and for checking whether two quotations use the same scope.
An illustrative lot of 100 boards at 12 currency units each, with 200 setup, 300 additional process work, 100 inspection and 50 logistics, totals 1,850. The effective value is 18.50 per ordered board. This arithmetic does not predict scrap, yield, customs charges or unentered engineering changes.

Entered manufacturing cost scenario
Entered manufacturing cost scenario
Use the current inputs and keep the assumptions
Start with the example to understand the units and output, then use Clear for my inputs before entering your project. Example mode stays visibly labeled even if you edit its numbers. The form begins without a result so an illustrative value cannot be mistaken for an approved requirement. Every field must have a valid value; zero is accepted only where it has a meaningful role in the particular model.
Read the input notes before calculating. They identify the physical boundary and what is excluded. Keep the same unit convention across the drawing and worksheet. Changing an input invalidates the previous result and disables its download until you calculate again. This prevents an old number from appearing to describe a revised geometry.
The result is a screening record. A negative margin or an out-of-range condition identifies a question to resolve; a positive margin is not a manufacturing approval. Use the record with the actual drawing, material and project requirement. The model does not load CAD files, inspect images or retrieve private factory data.
Download the current result if it helps the discussion. The text includes the entered inputs, result and limitations. It stays on your device until you choose to attach or share it. Contact is a separate step; this page does not automatically populate the enquiry form or upload a file. Avoid confidential identifiers if you only need an exploratory calculation.
| Input | What to establish before using it |
|---|---|
| Review reference | Use a nonconfidential reference that lets you connect this calculation to the correct drawing revision. |
| Currency label | This label is printed with the result. No currency conversion, live pricing or quote service is connected. |
| Ordered boards or retained parts | Use the same quantity and delivery scope when comparing alternatives. The denominator is ordered units, not panel starts. |
| Entered recurring value per unit | Use a supplier quote or your own labeled planning assumption. No preset market rate or FR-4 multiplier is supplied. |
| One-time setup allowance | Include only work not already included elsewhere. Engineering, tooling and programming may be separate quoted items. |
| Additional process-route allowance per lot | Enter the reviewed special-process scope for this page. Do not multiply by guessed cycle counts or include the same operation in the unit value twice. |
| Inspection / qualification allowance per lot | Keep the evidence scope explicit. A qualification build and routine lot inspection can be different deliverables. |
| Other included lot charges | State what this allowance includes in your review. Taxes, freight, customs, yield and contingency are not added automatically. |
Cost reductions worth reviewing
Consider reducing unnecessary layer transitions, enlarging features where space permits, improving panel utilization or limiting specialized fill and cap treatment to the required holes. Changing component placement or net assignment may remove a difficult escape problem. Each option must preserve the electrical and assembly requirements.
Do not reduce cost by silently weakening acceptance conditions. If a qualification test or construction requirement is no longer needed, document the engineering reason and approval. A lower quotation based on omitted evidence is a scope change, not necessarily a process improvement.
Account for uncertainty explicitly
Early designs may lack a final stackup, component land pattern or material choice. Mark those assumptions and ask which quote lines depend on them. Request a revised quote when the affected requirement changes. Avoid presenting an early spreadsheet total as a committed production price.
For interface concerns, review stacked vias. For physical hole formation, use micro-hole technology. This page owns the cost comparison and the design decisions that change it; it does not repeat those process guides in full.
Prepare a productive enquiry
Send the stackup proposal, layer-pair map, critical feature sizes, board dimensions, quantity and build stage. State whether the project is a feasibility sample, qualification build or recurring order. Attach any supplier quotations only when you are authorized to share them; a summarized common scope is often sufficient for an internal comparison.
Can the tool quote a board from its layer count? No. Does one extra microvia stage always add the same percentage? No. Should the lowest-cost route be selected automatically? Only after the design and acceptance scope are equivalent. The most useful result is a short list of cost-driving requirements that can be reviewed without compromising function.
Review the architecture through its complete build sequence
Create a layer-access map before optimizing individual dimensions. For each important net group, show where it starts, where it must reach and which reference structure accompanies the route. Then identify the physical interconnect used at each step. A line drawn between two layer numbers is only a connectivity requirement until the actual sequence of holes, lands and intermediate copper is defined.
Ask the fabricator to review the architecture while placement and routing choices are still flexible. A small early change to an escape pattern may avoid an additional specialized operation. A late change can affect the stackup, impedance, fabrication data and assembly land design at the same time. Record the dependencies so a cost reduction does not accidentally become an electrical or assembly regression.
Review the whole material and copper construction. The same nominal layer count can use different dielectric thicknesses, foil choices and internal connections. Material trade names alone do not describe the complete build. Keep the exact grade, relevant construction and approved alternatives with the stackup proposal. If a substitution changes the dielectric or thermal behavior, revisit the affected engineering requirements.
Inspection and qualification need a representative structure. Ask which geometries, layer spans and process stages a sample actually covers. A continuity check at room temperature and a test under relevant thermal exposure address different questions. A polished section is useful for understanding geometry at its location, but it cannot establish the behavior of every interface across all production conditions. Keep those limits visible when reviewing evidence.
The commercial comparison should use the same construction and acceptance scope. Separate a feasibility sample from a qualified recurring production route. Ask what is included in setup, coupons, inspection and any additional evidence work. Where the architecture remains open, request alternatives with their assumptions stated rather than allowing a low total to hide a different interconnect design.
Before release, reconcile the layer-access map with the actual CAD outputs. Confirm that each hole span exists where intended and that no obsolete pad stack remains in a dense region. Preserve the approved stackup, manufacturing proposal and open-item disposition together. The outcome should be a coherent construction that the design, fabrication and assembly teams can each interpret, not just a page of ambitious feature sizes.
Standards, source context and limits
Use the performance and acceptance documents named in the procurement agreement, including their revisions and any applicable addenda. A design guide explains choices; a product acceptance requirement defines what must be demonstrated. Neither a reference link nor a calculator result is a certification of the board or the supplier. Where a value is contractually important, check the controlled document and agree the measurement method with the responsible parties.
Examples on this page are deliberately labeled and are not advertised RAYPCB limits. Supplier documentation is linked for the specific material or process context it explains. Equipment photographs and cross-section examples show the subject; they are not current production, inspection or qualification records for your order.